Electrical HomeElectrical

  • LA/LB Remote Operations Phase 1

    Federal Construction Group, Inc. is tasked to upgrade existing RPM equipment at each of the terminals included in Phase 1 to allow CBP to operate the RPMs from a remote location (Ocean Boulevard). Remote operation will require 1) Remotely accessible situational awareness (surveillance cameras), remotely controlled RPM and traffic control (gate arms, traffic lights), and remotely […]

  • Install Power Supplies for AWIL AIRC

    Federal Construction Group, Inc. is tasked to provide all labor, materials, tools, transportation, equipment, apparatus, permits, testing, and supervision for complete installation from the power source to the local fused disconnects. The location of the government supplied 72 KW, 270VDC Solid State (Vertical Stationary) Power Supply are: One (1) unit shall be installed in the […]

  • Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279

    Federal Construction Group, Inc. is tasked to provide all labor, materials, tools, transportation, equipment, apparatus, permits, testing, and supervision for complete installation from the power source to the local fused disconnects. The location of the government supplied 72 KW, 270VDC Solid State (Vertical Stationary) Power Supply are: One unit shall be installed in the hangar […]

  • Replace Michelson Lab Substation at NAWS, China Lake, CA

    Fed Con/South Bay Joint Venture is tasked to replace the Michelson Lab Substation with a new Michelson Lab Substation west of the existing substation and incidental related work. a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or […]

  • Naco Design Build Perimeter Lighting

    Federal Construction Group, Inc. is tasked to: 1. Provide a working schedule and work plan to GSA project management prior to start of work. Both the schedule and plan shall include all the necessary phasing of all design, demolition and construction activities to minimize impact to ongoing U.S. Customs and Border Protection (CBP) operations. 2. […]

  • Design Build Fallon Various Airfield Lighting Repairs

    Fed Con/South Bay Joint Venture is tasked to repair and replace damaged and inefficient and failing airfield, taxiway fixtures, constant current 5kV rated airfield lighting cable, and a constant current regulator. This project shall specifically target the Alpha Taxiway, APRONs 1 and 2, Fuels, Egress, and Combat Aircraft loading Area (CALA) operating circuit areas. All elements […]

  • Repair North Range Electrical Distribution

    Fed Con/South Bay Joint Venture is tasked to repair the electrical distribution systems at NAWS China Lake, CA. New NAF Substation must be ready for operation as approved by Contracting Officer before work is started on demolition of existing NAF Substation which would interfere with normal operation.  The existing NAF Substation will remain in operation […]

  • Repair Photovoltaic System Facility NOS. 33056

    Federal Construction Group, Inc. is tasked to provide all labor, material and equipment necessary to troubleshoot and investigate repetitive Photo Voltaic to generator synchronization issues at the Junction Ranch and Darwin EOD Photo Voltaic electrical supply sites. Both systems are going offline several times per month resulting in loss of power to these critical RDT&E and […]

  • Design- Build, Arresting Net System and Lights

    Fed Con/South Bay Joint Venture is tasked to remove and replace the existing wedge type antivehicle barriers, lighting and controls at the four (4) entrance gates to Travis Air Force Base in both the inbound and outbound lanes at the following locations; The Main Gate Facility 600, Hospital Gate Facility 728, South Gate Facility 999, & […]

  • San Luis I Combined Projects

    Federal Construction Group, Inc. is tasked to replace metal screen and storm doors in the K-9 building to include all hardware and locks.  Add six hand dryers in each restroom in the main building to include all electrical service required from the nearest viable source per the NEC.  Add five additional hand dryers in the […]

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS