  • RPM Installation at 40th Street and 16th Street Exit Gates

    Federal Construction Group installed four radiation portal monitor systems (RPMs) within the Galveston Terminal.  The RPMs and booths were erected at two different locations within the terminal with two RPMs and one booth at each location.  The technical work included installation and erection of heavy steel enclosures, metal fabrications, concrete foundations, electrical conduit, wiring and communication networks […]

  • Renovate Hangar 6

    This renovation required us to produce architectural floor plans including reflective ceiling plan, cross sections, doors and hardware schedule, room finish schedule, mechanical equipment layout and revisions to ductwork, plumbing floor plan, modification to the existing fire alarm system, and any electrical equipment modifications.  The project included asbestos abatement at various locations, ceiling tile demolition […]

  • Roybal Elevator Modernization Phase I

    Examine the existing conditions, power supply, standby/emergency power supply, mainline disconnect, and include all work needed to ensure a fully code compliant modernization.  Modernize eight elevators including: controllers, motors doors and door operators, car interiors, electrical, traveling cables, access control and security features.

  • Installation of a Radiation Portal

    New construction of a Department of Homeland Security Radiation Portal Monitor and supporting structures at the Port of New Orleans, LA.

  • Design Build Addition to Bldg 1950

    Design, build new 1,000 sf. building addition at the water treatment plant building 1950. Implement SET team approach Able to work in variable and unknown conditions Interfaces with NAVFAC, public works and FEAD teams Offered and installed VA/VE design Provided FFE package Special structural considerations taken

  • RPM Installations at Detroit – Blue Water and Algonac

    Install Radiation Portal Monitors at Seaport Vectors between USA and Canada Solid Subcontractor Basis 40 Day Performance Period Critical Mission Per the Dept. of Homeland Security

  • Design Build Sea Wells at San Nicolas Is.

    Design, build and redevelop seawells on SNI. Implemented SET team approach Able to work in variable and challenging logistical conditions Interfaced extremely well with public works and FEAD teams Offered and installed VA/VE design Exceed all performance expectations Performed within the initial contract intent without change order phenq ingredients, phenq side effects, phenq reviews 2019, phenq coupon codes, does […]

  • Design Build Mass Notification System

    Design build new mass notification system at Bldg A33 Wings 1 & 2 Precision scheduling to accommodate Naval Operations Ability to work in restricted windows of time – SCIFs Able to work in variable and unknown conditions Confined space conditions Interface with Contracting and Public Work teams on base Massive 500,000 square foot facility – Phased […]

  • Replace Fire Alarm Hangar 811

    Replace all head-end fire alarm equipment including panels, heat detectors, IR detectors and supervisory devices. Collaborative project with Simplex-Grinnell Interfaced with Civil Engineering and Base Fire Personnel Offered and installed VA/VE design. High Lift Work within a C130 Hanger over 50,000 SQ. Ft. Timely project – 90 day completion period