General Construction HomeGeneral Construction

  • Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279

    Federal Construction Group, Inc. is tasked to provide all labor, materials, tools, transportation, equipment, apparatus, permits, testing, and supervision for complete installation from the power source to the local fused disconnects. The location of the government supplied 72 KW, 270VDC Solid State (Vertical Stationary) Power Supply are: One unit shall be installed in the hangar […]

  • Pre Trial Carpet Replacement

    Federal Construction Group, Inc. is tasked to replace the pre trial room carpet.

  • Replace Emergency Generator

    Federal Construction Group, Inc. is tasked to replace the emergency generator at the Raul H. Castro Land Port of Entry in Douglas, AZ.

  • Replace Emergency Generator

    Federal Construction Group, Inc. is tasked to replace the emergency generator in San Luis Land Port of Entry.

  • Replace Emergency Generator

    Federal Construction Group, Inc. is tasked to replace the emergency generator at Raul H. Castro LPOE in Douglas, AZ.

  • VIG Portsmouth RO Upgrade

    Federal Construction Group, Inc. is tasked to install equipment to support remote operation (RO) of radiation portal monitors (RPM) at the main gate of the Virginia International Gateway (VIG). Project involves installing infrastructure and equipment to implement/support RO capabilities at VIG. RO will allow for VIG to operate all gates at both Rail and main gate […]

  • Replace Carpet

    Federal Construction Group, Inc. is tasked to remove and install new, agency approved, carpet and cove base.  Modular office furniture will need to be moved and placed back upon completion of project.  Ensure all electrical connections are disconnected and secured while work is performed.

  • Replace Michelson Lab Substation at NAWS, China Lake, CA

    Fed Con/South Bay Joint Venture is tasked to replace the Michelson Lab Substation with a new Michelson Lab Substation west of the existing substation and incidental related work. a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or […]

  • NSA B10 Renovation of Security Area

    Federal Construction Group, Inc. is tasked to remove all furniture/chairs throughout security area and place in a temporary holding area during renovation and be placed back into existing location when project is complete. Security personnel will provide space allowed for all furniture. Government Personal Lockers in the kitchen area shall be demo and replaced with 28 […]

  • Replace Bravo Pier Fire Pump

    Fed Con/South Bay Joint Venture is tasked to provide design build, planning, construction, labor, transportation, material, supplies, equipment, and supervision necessary to replace the fire pump at Bravo Pier. a.) Complete demolition of Salt water fire pumping system and distribution system in B-812 and on the pier/underneath the pier, to include all fire protection piping on/underneath […]

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS