  • USDC SDO Pretrial Carpet and VCT 2-Room Conversion

    Federal Construction Group, Inc. is tasked to replace the existing carpet in the Pretrial Services Suite and convert the VCT rooms 3321 and 3321B to Staff Attorney Offices.  This includes the relocation of data lines/jacks, removal of acoustical wall panels, patch, repair and paint of identified walls and the additional cove base for the new […]

  • Walsh Lobby Wall Monitor Installation

    Federal Construction Group, Inc. is tasked to provide and install three wall-mounted Government Furnished Equipment (GFE) monitors complete with electrical and IT rough-in in the main James A. Walsh Courthouse above the mailboxes.

  • Judges Elevator Refresh

    Federal Construction Group, Inc. is tasked to supply all labor and materials to make the repoars to the judges elevator cab interior and access door. Surface preparation of interior panels Apply pressure sensitive architectural overlay film to interior surface panels and access door Edges shall be finished to reduce and discourage peeling Remove and install […]

  • LA/LB Remote Operations Phase 1

    Federal Construction Group, Inc. is tasked to upgrade existing RPM equipment at each of the terminals included in Phase 1 to allow CBP to operate the RPMs from a remote location (Ocean Boulevard). Remote operation will require 1) Remotely accessible situational awareness (surveillance cameras), remotely controlled RPM and traffic control (gate arms, traffic lights), and remotely […]

  • CAAA Bldg. 2540 Replace Awnings and Install Bollards

    Federal Construction Group, Inc. is tasked to provide 5 exterior door awnings made from aluminum framing using heavy duty skinned vinyl material and install sleeved bollard covers. Demo and replace existing door awnings to be replaced w/aluminum framed skinned with heavy duty vinyl material matching color scheme of existing as close as possible. Provide caution tape […]

  • Off-Installation Security Improvements at Four Facilities

    Federal Construction Group, Inc. is tasked to site visits to off installation Navy facilities throughout Indiana to complete a Physical Security Improvements Checklist for each facility to validate physical security capabilities required for each facility. Physical security capabilities to be installed at each facility may include a secondary exit, door hardware, doorbell, door chime, peep hole, […]

  • Bldg. 3234 Clean Room / C-Scan and Sanding Booth

    Federal Construction Group, Inc. is tasked to prepare Bldg. 3234 Rm. 012 for a future clean room and to prepare the C‐Scan area for future equipment. The future Clean Room area will need the existing ceiling removed, VAV box and ductwork relocated, air lines removed, door removed and blocked up, and electrical conduit and data raised […]

  • Bldg. 3006 Renovate Exterior and Paint Test

    Federal Construction Group, Inc. is tasked to provide repair/install of all Exterior Insulation and Finish System (EIFS) which is a general class of non-load bearing building cladding system that provides exterior walls with an insulated, water resistant, finished surface in an integrated composite material system. This project is to repair all exterior areas of Building 3006 […]

  • Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279

    Federal Construction Group, Inc. is tasked to provide all labor, materials, tools, transportation, equipment, apparatus, permits, testing, and supervision for complete installation from the power source to the local fused disconnects. The location of the government supplied 72 KW, 270VDC Solid State (Vertical Stationary) Power Supply are: One unit shall be installed in the hangar […]

  • Pre Trial Carpet Replacement

    Federal Construction Group, Inc. is tasked to replace the pre trial room carpet.