General Construction HomeGeneral Construction

  • CAAA Bldg. 2540 Replace Awnings and Install Bollards

    Federal Construction Group, Inc. is tasked to provide 5 exterior door awnings made from aluminum framing using heavy duty skinned vinyl material and install sleeved bollard covers. Demo and replace existing door awnings to be replaced w/aluminum framed skinned with heavy duty vinyl material matching color scheme of existing as close as possible. Provide caution tape […]

  • Off-Installation Security Improvements at Four Facilities

    Federal Construction Group, Inc. is tasked to site visits to off installation Navy facilities throughout Indiana to complete a Physical Security Improvements Checklist for each facility to validate physical security capabilities required for each facility. Physical security capabilities to be installed at each facility may include a secondary exit, door hardware, doorbell, door chime, peep hole, […]

  • Bldg. 3234 Clean Room / C-Scan and Sanding Booth

    Federal Construction Group, Inc. is tasked to prepare Bldg. 3234 Rm. 012 for a future clean room and to prepare the C‐Scan area for future equipment. The future Clean Room area will need the existing ceiling removed, VAV box and ductwork relocated, air lines removed, door removed and blocked up, and electrical conduit and data raised […]

  • Bldg. 3006 Renovate Exterior and Paint Test

    Federal Construction Group, Inc. is tasked to provide repair/install of all Exterior Insulation and Finish System (EIFS) which is a general class of non-load bearing building cladding system that provides exterior walls with an insulated, water resistant, finished surface in an integrated composite material system. This project is to repair all exterior areas of Building 3006 […]

  • Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279

    Federal Construction Group, Inc. is tasked to provide all labor, materials, tools, transportation, equipment, apparatus, permits, testing, and supervision for complete installation from the power source to the local fused disconnects. The location of the government supplied 72 KW, 270VDC Solid State (Vertical Stationary) Power Supply are: One unit shall be installed in the hangar […]

  • Pre Trial Carpet Replacement

    Federal Construction Group, Inc. is tasked to replace the pre trial room carpet.

  • Replace San Luis Emergency Generator

    Federal Construction Group, Inc. is tasked to replace the emergency generator in San Luis Land Port of Entry.

  • Replace Emergency Generator Douglas, AZ

    Federal Construction Group, Inc. is tasked to replace the emergency generator at Raul H. Castro LPOE in Douglas, AZ.

  • VIG Portsmouth RO Upgrade

    Federal Construction Group, Inc. is tasked to install equipment to support remote operation (RO) of radiation portal monitors (RPM) at the main gate of the Virginia International Gateway (VIG). Project involves installing infrastructure and equipment to implement/support RO capabilities at VIG. RO will allow for VIG to operate all gates at both Rail and main gate […]

  • Replace Carpet

    Federal Construction Group, Inc. is tasked to remove and install new, agency approved, carpet and cove base.  Modular office furniture will need to be moved and placed back upon completion of project.  Ensure all electrical connections are disconnected and secured while work is performed.

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS