General Construction HomeGeneral Construction

  • Replace Michelson Lab Substation at NAWS, China Lake, CA

    Fed Con/South Bay Joint Venture is tasked to replace the Michelson Lab Substation with a new Michelson Lab Substation west of the existing substation and incidental related work. a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or […]

  • NSA B10 Renovation of Security Area

    Federal Construction Group, Inc. is tasked to remove all furniture/chairs throughout security area and place in a temporary holding area during renovation and be placed back into existing location when project is complete. Security personnel will provide space allowed for all furniture. Government Personal Lockers in the kitchen area shall be demo and replaced with 28 […]

  • Replace Bravo Pier Fire Pump

    Fed Con/South Bay Joint Venture is tasked to provide design build, planning, construction, labor, transportation, material, supplies, equipment, and supervision necessary to replace the fire pump at Bravo Pier. a.) Complete demolition of Salt water fire pumping system and distribution system in B-812 and on the pier/underneath the pier, to include all fire protection piping on/underneath […]

  • San Luis 2 Concrete and Air Tube

    Federal Construction Group, Inc. is tasked to develop and provide site investigation to verify the existing site and conditions prior to the beginning of construction of Air Tube Delivery System.  Provide and install an outdoor Pneumatic (Air) Tube deliver system and new CIB concrete pavement island matching the elevation, finish and slope of the existing […]

  • Naco Design Build Perimeter Lighting

    Federal Construction Group, Inc. is tasked to: 1. Provide a working schedule and work plan to GSA project management prior to start of work. Both the schedule and plan shall include all the necessary phasing of all design, demolition and construction activities to minimize impact to ongoing U.S. Customs and Border Protection (CBP) operations. 2. […]

  • Cincinnati IMF Ludlum to Leidos Converstion

    Federal Construction Group, Inc. is tasked to converting two (2) four panel cargo Ludlum RPMs to a four panel Leidos RPM at the Cincinnati International Mail Facility, located at the Cincinnati/Northern Kentucky International Airport located in Hebron Kentucky. Site Visit Photos

  • Design Build Fallon Various Airfield Lighting Repairs

    Fed Con/South Bay Joint Venture is tasked to repair and replace damaged and inefficient and failing airfield, taxiway fixtures, constant current 5kV rated airfield lighting cable, and a constant current regulator. This project shall specifically target the Alpha Taxiway, APRONs 1 and 2, Fuels, Egress, and Combat Aircraft loading Area (CALA) operating circuit areas. All elements […]

  • Repair North Range Electrical Distribution

    Fed Con/South Bay Joint Venture is tasked to repair the electrical distribution systems at NAWS China Lake, CA. New NAF Substation must be ready for operation as approved by Contracting Officer before work is started on demolition of existing NAF Substation which would interfere with normal operation.  The existing NAF Substation will remain in operation […]

  • Construct Ready Service Magazine

    Federal Construction Group, Inc. was tasked to provide construction of a ready service magazine tied into southeast wall of the existing magazine, Building 20284. Building 20284 is located at Armitage Field as indicated on IR-9-8707/T1drawing. Building is approximately 4 miles north from Base Main Gate.

  • Repair Water Drainage B-499 (D-Wing)

    Federal Construction Group, Inc. is tasked to repair water drainage at Building 499 (D-Wing) at Randolph AFB, TX.

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS