  • Paint Exterior Bldg. 1210

    Federal Construction Group, Inc. is tasked to prepare, prime and apply paint (2 coats) on approximately 145,000SF. of exterior area to include, window frames, gills, louvers, vents, electrical conduits, soffit, window lattice framing, metal siding panels, entrance doors, duct work, trim fascia, rain gutters/downspouts, roll up doors, rails, mechanical equipment, bollards, metal exterior ladders, metal […]

  • Paint Exterior Bldg. 1207

    Federal Construction Group, Inc. is tasked to prepare, prime and apply paint (2 coats) on approximately 150,000 SF. of exterior area to include, window frames, grills, louvers, vents, electrical conduits, soffit, window lattice framing, metal siding panels, entrance doors, duct work, trim, fascia, rain gutters/downspouts, roll up doors, rails, mechanical equipment, bollards, metal exterior ladders, metal […]

  • Paint Exterior Bldg. 2810

    Federal Construction Group, Inc. is tasked to lead abate, prepare, prime and apply paint (2 coats) on approximately 12,000 SF. of exterior area to include, concrete walls, soffits, conduits, duct work, entrance doors, door frames, window sash, window frames, trim, fascia, rain gutters/downspouts, rails, mechanical equipment, bollards, metal exterior ladders, grills, mechanical equipment, fire hydrants, […]

  • Paint Exterior Bldg. 2660

    Federal Construction Group, Inc. is tasked to lead abate, prepare, prime and apply paint (2 coats) on approximately 20,000SF. of exterior area to include, concrete walls, soffits, conduits, duct work, entrance doors, door frames, window sash, window frames, trim, fascia, rain gutters/downspouts, rails, mechanical equipment, bollards, metal exterior ladders, grills, mechanical equipment, fire hydrants, roof […]

  • Paint Exterior Bldg. 3804

    Federal Construction Group, Inc. is tasked to furnish all labor, materials, equipment and supervision required to abate lead paint, prepare, prime and apply paint (2 coats) to approximately 100,000 SF. of exterior area to include, concrete walls, soffits, duct work, entrance doors, door frames, window sash, window frames, louvers, piping, trim, roll up doors, fascia, […]

  • Power for CIP Virtual Simulation (D41R1006)

    Federal Construction Group, Inc. is tasked to prepare Room 34 of Building 31598 for the installation of customer provided Virtual Simulation Equipment for Integration and Interoperability (I&I) Equipment. SCOPE OF WORK: Remove existing 225KVA 120/208V transformer and replace with a new 750KVA 120/208V transformer. Reuse existing slab and connect secondary to new 2000A Switchboard. Remove […]

  • Renovate Randolph Golf Club Snack Bar

    Federal Construction Group, Inc. has been tasked to furnish all necessary plant, labor and materials; and constructing, installing and performing all work shown and described in the contract documents, all of which are made a part thereof.  Character of Work and Mechanics: The work shall be executed in the best and most workmanlike manner by […]

  • USDC Grand Jury AV

    Federal Construction Group, Inc. is tasked to perform the general space alterations including minor demolition, construction, electrical, communications cabling, finishes and life safety systems for the Sandra Day O’Connor Grand Jury Space. Scope of Work: Demolition, preparation and installation Prep and paint walls, repair and replace shelve units an components Electrical and infrastructure HVAC units, […]

  • Convert 13 Lanes of RPM’s from Ludlum to Leidos Units

    Federal Construction Group, Inc. is tasked to convert 13 lanes of RPM’s from Ludlum units to Leidos units in Blaine, WA.

  • Repair Anechoic Chamber Fire System Bldg. 00005

    Federal Construction Group, Inc. is tasked to do the demolition of wet and pre action sprinkler systems that currently protect the anechoic chamber in room 131 of building 00005. Sprinkler systems shall be replaced with complete clean agent system including Very Early Warning Smoke Detection (VEWSD) and new fire panel.  The anechoic chamber is used […]