  • Provide AFFF to PM362 for Fire Scout

    Fed Con/South Bay Joint Venture is tasked to: 1) Provide Aqueous Film Forming Foam (AFFF) / Low-level Foam Systems to the entire hangar floor – (See Part 3 D40 for requirements) 2) Modify fire alarm system per RFP Part-3 D40. 3) See RFP Part-3 D50 for all electrical work. 4) Provide trench (with traffic rated […]

  • Fire Alarm Control Panel Repair

    Federal Construction Group, Inc. is tasked to Repair fire alarm system a) Contractor shall repair and update Fire Alarm Control Panel (FACP). b) Contractor shall remove existing AFFF Release Panel and install new release panel. Existing Aqueous Film Forming Foam(AFFF) panel is out-of-date and cannot be upgraded. c) Contractor shall repair 14 fire alarm pull […]

  • Fire Suppression Service and Repair

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items within this SOW. This SOW covers multiply buildings with various fire suppression repairs. Scope of Work: Bldg. #78 Repair a) Contractor will remove current fire […]

  • Fire Alarm Extension Bldg. 220

    Federal Construction Group, Inc. is tasked to provide for an extension of the newly installed Gamewell-FCI fire alarm and mass notification system for Bldg. No. 220, Naval Support Activity Monterey, CA. The intent of this project is to provide an integrated fire alarm and mass notification systems capable of notifying building occupants inside the facility.

  • Replace Bravo Pier Fire Pump

    Fed Con/South Bay Joint Venture is tasked to provide design build, planning, construction, labor, transportation, material, supplies, equipment, and supervision necessary to replace the fire pump at Bravo Pier. a.) Complete demolition of Salt water fire pumping system and distribution system in B-812 and on the pier/underneath the pier, to include all fire protection piping on/underneath […]

  • Repair Multiple Buidlings with Various Fire Suppression Systems

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items andservices necessary to perform: inspection, abatement, installation and repair to all items within this SOW. This SOW covers multiply buildings with various fire suppression repairs. Bldg. 3345 Remove existing broken jockey pump for fire pump system. Install new […]

  • Grounding Points in Hangar 157, 80, 76, and 75

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items within this SOW.  All newly repair and or installed items shall be complete and useable upon completion of work.  Cleanup work site and dispose of […]

  • Repair Fire Alarm System Bldg. 02308

    Fed Con/South Bay Joint Venture is tasked to bring the audible/visual in the individual rooms in building 02308 up to the latest NFPA 72 and UFC 3-600-01. To meet the ADA/ABA guidelines regarding visual devices in the assembly occupied rooms. Any furniture or items will need to be protected by covering them or move them […]

  • Fire Suppression Replace Fire Pump in Building 1700

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to replace fire pump, electric motor, and motor control. Contractor will need to replace site glass tube on water tank, current sight glass is damaged. Contractor will install Cla-Val for automatic filling of water […]

  • USDC Grand Jury AV

    Federal Construction Group, Inc. is tasked to perform the general space alterations including minor demolition, construction, electrical, communications cabling, finishes and life safety systems for the Sandra Day O’Connor Grand Jury Space. Scope of Work: Demolition, preparation and installation Prep and paint walls, repair and replace shelve units an components Electrical and infrastructure HVAC units, […]