Life, Safety & Security HomeLife, Safety & Security

  • Fire Suppression Upgrade Camp Billy Machen

    Fed Con/South Bay Joint Venture is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to replace fire pump, electric motor, fire pump motor control, and leaking underground fire suppression line. Fire Pump House Building 6004 Demolition: (a) Contractor will remove existing fire pumps and electric motor. (b) […]

  • Fire Suppression Services Abatement of AFFF

    Federal Construction Group, Inc. is tasked to Repair/Replace Fire Suppression Systems, Fire Alarm Systems and Hood Systems. Each repair/replacement will be unique to individual building in accordance with (IAW) the scope of work (SOW). Each Building will be separately proposed; the proposal will be broken out to reflect the cost of materials, labor hours with […]

  • FY19 3rd Qtr. Fire Suppression Repair

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items within this statement of work (SOW). This SOW covers multiply buildings with various fire suppression repairs. Scope of Work: Bldg. 1523 Demolition a) Remove […]

  • Repair Fire Sprinkler System Bldg. 15754

    Fed Con/South Bay Joint Venture is tasked to perform all work to include all labor, materials, equipment, supervision, personnel, and transportation necessary for fire sprinkler system repairs at building 15754 in the Propulsion Lab (PL) area. Work will include 4” water line repair, gunite berm excavation and repair, testing and verification of system performance with […]

  • Provide AFFF to PM362 for Fire Scout

    Fed Con/South Bay Joint Venture is tasked to: 1) Provide Aqueous Film Forming Foam (AFFF) / Low-level Foam Systems to the entire hangar floor – (See Part 3 D40 for requirements) 2) Modify fire alarm system per RFP Part-3 D40. 3) See RFP Part-3 D50 for all electrical work. 4) Provide trench (with traffic rated […]

  • Fire Alarm Control Panel Repair

    Federal Construction Group, Inc. is tasked to Repair fire alarm system a) Contractor shall repair and update Fire Alarm Control Panel (FACP). b) Contractor shall remove existing AFFF Release Panel and install new release panel. Existing Aqueous Film Forming Foam(AFFF) panel is out-of-date and cannot be upgraded. c) Contractor shall repair 14 fire alarm pull […]

  • Fire Suppression Service and Repair

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items within this SOW. This SOW covers multiply buildings with various fire suppression repairs. Scope of Work: Bldg. #78 Repair a) Contractor will remove current fire […]

  • Fire Alarm Extension Bldg. 220

    Federal Construction Group, Inc. is tasked to provide for an extension of the newly installed Gamewell-FCI fire alarm and mass notification system for Bldg. No. 220, Naval Support Activity Monterey, CA. The intent of this project is to provide an integrated fire alarm and mass notification systems capable of notifying building occupants inside the facility.

  • Replace Bravo Pier Fire Pump

    Fed Con/South Bay Joint Venture is tasked to provide design build, planning, construction, labor, transportation, material, supplies, equipment, and supervision necessary to replace the fire pump at Bravo Pier. a.) Complete demolition of Salt water fire pumping system and distribution system in B-812 and on the pier/underneath the pier, to include all fire protection piping on/underneath […]

  • Repair Multiple Buidlings with Various Fire Suppression Systems

    Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items andservices necessary to perform: inspection, abatement, installation and repair to all items within this SOW. This SOW covers multiply buildings with various fire suppression repairs. Bldg. 3345 Remove existing broken jockey pump for fire pump system. Install new […]

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS