Projects HomeProjects

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’, making it look like readable English.

  • Commercial Outbound Inbound Railing Repair
    July, 2020
  • Parking Lot Reseal and Restripe
    June, 2020
  • Mechanical Shop Painting
    June, 2020
  • Fire Suppression Services Public Announcement System Repair
    May, 2020
  • Agicultural Office Tenant Improvements
    April, 2020
  • EVO Chamber 5650 Refurbishment
    April, 2020
  • Design Build Repair by Replacement of Fire Alarm System BLDG. 625
    March, 2020
  • Design Build Replace Electrical Substaions at MCRD
    March, 2020
  • USDA PACA Remodel
    March, 2020
  • MAP K105 BRG
    March, 2020
  • Replace Blast Door System at the Lloyd D. Geroge USCH
    March, 2020
  • EVO DeConcini Office Carpet and Paint
    March, 2020
  • SDO Misc. Patch and Paint Projects
    November, 2019
  • HDA-50 Repair Fire Protection System
    November, 2019
  • Main Gate Entrace Temporary Office
    October, 2019
  • Install a Physical Range Control Office
    September, 2019
  • Earthquake Repairs Bldg. 00019 and Bldg. 20001
    September, 2019
  • Windows and Doors Restoration
    September, 2019
  • Paint Exterior Doors and Louvers
    September, 2019
  • Sandquist Gate Enhancement Bldg. 02465
    September, 2019
  • Fire Suppression Upgrade Camp Billy Machen
    September, 2019
  • Windows and Doors Restoration
    September, 2019
  • Elevator 7 & 8 Modernization
    September, 2019
  • Fire Suppression Services Abatement of AFFF
    September, 2019
  • FY19 3rd Qtr. Fire Suppression Repair
    September, 2019
  • USMC Basement Sally Port Terrazzo
    September, 2019
  • MAP Reservoir Fence Installation
    September, 2019
  • Chamber 421 and 524 Refurbishment
    July, 2019
  • CAAA Bldgs 145 and 148 Infill Windows
    June, 2019
  • CAAA Bldg 3149 Painting North/South Test Cell B
    June, 2019
  • Replace Electrical Supporting Mission Control
    April, 2019
  • CIB Flooring Replacement
    February, 2019
  • Repair Fire Sprinkler System Bldg. 15754
    January, 2019
  • Repair Security Lights Bldg. 31047
    December, 2018
  • USDC SDO Pretrial Carpet and VCT 2-Room Conversion
    November, 2018
  • Walsh Lobby Wall Monitor Installation
    November, 2018
  • Judges Elevator Refresh
    November, 2018
  • LA/LB Remote Operations Phase 1
    October, 2018
  • CAAA Bldg. 2540 Replace Awnings and Install Bollards
    October, 2018
  • Off-Installation Security Improvements at Four Facilities
    October, 2018
  • Bldg. 3234 Clean Room / C-Scan and Sanding Booth
    October, 2018
  • Bldg. 3006 Renovate Exterior and Paint Test
    October, 2018
  • Provide AFFF to PM362 for Fire Scout
    October, 2018
  • NBPL-500 Remove Ansul System Install a Hood and FSS
    October, 2018
  • Fire Alarm Control Panel Repair
    August, 2018
  • Fire Suppression Service and Repair
    August, 2018
  • Fire Alarm Extension Bldg. 220
    August, 2018
  • Install Power Supplies for AWIL AIRC
    August, 2018
  • Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279
    August, 2018
  • Pre Trial Carpet Replacement
    July, 2018
  • Replace San Luis Emergency Generator
    July, 2018
  • Replace Emergency Generator Douglas, AZ
    July, 2018
  • VIG Portsmouth RO Upgrade
    May, 2018
  • Replace Carpet
    March, 2018
  • Replace Michelson Lab Substation at NAWS, China Lake, CA
    March, 2018
  • NSA B10 Renovation of Security Area
    February, 2018
  • Replace Bravo Pier Fire Pump
    February, 2018
  • San Luis 2 Concrete and Air Tube
    February, 2018
  • Naco Design Build Perimeter Lighting
    February, 2018
  • Cincinnati IMF Ludlum to Leidos Converstion
    January, 2018
  • Design Build Fallon Various Airfield Lighting Repairs
    December, 2017
  • Repair Multiple Buidlings with Various Fire Suppression Systems
    November, 2017
  • Repair North Range Electrical Distribution
    November, 2017
  • Construct Ready Service Magazine
    November, 2017
  • Repair Water Drainage B-499 (D-Wing)
    October, 2017
  • Grounding Points in Hangar 157, 80, 76, and 75
    October, 2017
  • Repair Photovoltaic System Facility NOS. 33056
    September, 2017
  • Design- Build, Arresting Net System and Lights
    September, 2017
  • San Luis I Combined Projects
    September, 2017
  • Provide Back-Up Generator to Bldg. 20286
    September, 2017
  • Paint the Cargo Dock East and South Side
    September, 2017
  • 3330C Atrium Sound Abatement
    August, 2017
  • B3168 Paint Main Hallways and Install Vinyl Cove Base
    August, 2017
  • Phibcor 209 Interior Lighting Retrofit
    August, 2017
  • Paint Exterior Bldg. 2412
    June, 2017
  • Paint Exterior Bldg. 3700
    June, 2017
  • Paint Exterior Bldg. 1210
    June, 2017
  • Paint Exterior Bldg. 1207
    June, 2017
  • Paint Exterior Bldg. 2810
    June, 2017
  • Paint Exterior Bldg. 2660
    June, 2017
  • Paint Exterior Bldg. 3804
    June, 2017
  • Power for CIP Virtual Simulation (D41R1006)
    June, 2017
  • Renovate Randolph Golf Club Snack Bar
    May, 2017
  • Repair Fire Alarm System Bldg. 02308
    May, 2017
  • Replace 34.5 KV UG RA Conductor Cable
    April, 2017
  • Fire Suppression Replace Fire Pump in Building 1700
    February, 2017
  • USDC Grand Jury AV
    January, 2017
  • Convert 13 Lanes of RPM’s from Ludlum to Leidos Units
    January, 2017
  • Repair Anechoic Chamber Fire System Bldg. 00005
    January, 2017
  • Fire Suppression Building 109 Remove Three IR Detectors
    January, 2017
  • LUNU RPM Removal
    January, 2017
  • Emergency High Voltage Repair Baker Range
    December, 2016
  • Convert Water Treatment Plant System Bldg. 02694
    December, 2016
  • RM15-2815 Repair and Upgrade SNI 319
    November, 2016
  • Fire Alarm and Fire Sprinkler
    November, 2016
  • Decommission Radiation Portal Monitors at Land Ports of Entry in Vermont and Maine
    October, 2016
  • FACP Replacement at Building 240
    October, 2016
  • Install Fire Alarm in Building 4000
    October, 2016
  • Paint Exterior Building 6000
    October, 2016
  • Paint Interior Room 142-Building 145
    October, 2016
  • Paint Exterior Bldg. 2419
    October, 2016
  • Cathodic Proteciton Bldg. 20275
    October, 2016
  • Paint Exterior Building 6030
    October, 2016
  • Design Build Repair Fire Suppression System to FOTS Hub in the Michelson Lab Building
    September, 2016
  • JBSA Lackland Airfield Crack Repair
    September, 2016
  • Expand Communication Infrastructure-MDMC Yermo Annex
    September, 2016
  • Fire Suppression Replace Fire Alarm Panel Building 1020
    September, 2016
  • FSS-FA Repairs Building 3340 ALF
    September, 2016
  • Replace Chiller Bldg. 00947
    September, 2016
  • Repair by Replacement of NAF Substation
    September, 2016
  • PE15321R Connect 52 and 62 Areas Electrical Distribution Systems
    September, 2016
  • Electrical System Distribution for Landslide Mitigation
    September, 2016
  • Paint Exterior Bldg. 3497
    September, 2016
  • PE14066M Repair the Fire Alarm System Bldg. 210440 (BOQ)
    September, 2016
  • Fire and Life Safety Systems Service Agreement
    September, 2016
  • Decommission Radiation Portal Monitors at Lewiston Bridge, New York
    September, 2016
  • Relocate Ground-Air Transmit-Receive Switch (GATR) Facility 715
    September, 2016
  • Construct Restrooms at Danville Test Pad
    August, 2016
  • Maintain Floor Building 2209
    July, 2016
  • Install Circuits Building 00005
    July, 2016
  • Various Building Fire Alarm Repairs
    June, 2016
  • Repair Exhaust Systems, Bowling Center
    June, 2016
  • Repair Overhead Slate Range Power Lines
    June, 2016
  • Paint Exterior B4493, 4494, 4496 and 4505
    June, 2016
  • Modify Room 302, Building 00005
    May, 2016
  • Replace Energy Lighting Control, Bldg. 00010
    May, 2016
  • Install Boiler Bldg. 01016 (FAR PWCL0105)
    May, 2016
  • FSS Repairs
    May, 2016
  • Increase Power to Bldg. 31462
    April, 2016
  • Paint Interior Bldg. 4456
    April, 2016
  • Paint Interior Building B5560
    April, 2016
  • Paint Exterior Bldg. 1630
    April, 2016
  • Paint Exterior Bldg. 1600
    April, 2016
  • Install GQM-163 Launcher for NAWCWD at San Nicolas Island
    April, 2016
  • Paint Exterior Bldg. 1414
    April, 2016
  • Various Repairs to Building 11100
    February, 2016
  • Repair HVAC Dampers
    January, 2016
  • Provide Backup Power, Main Gate Area
    January, 2016
  • Repair Fire Alarm System, Building 20001
    January, 2016
  • Emergency Repair Calls for High Voltage Electrical Distribution Systems
    January, 2016
  • Paint Exterior Building 1634
    December, 2015
  • Install Shade Canopies at Slagel Dining Facility Bldg. 1287
    October, 2015
  • Carpet Removal Installation B1199 Room 114
    October, 2015
  • Paint Exterior Bldg. 1634
    October, 2015
  • Installation of Fire Protection System PH1201
    September, 2015
  • Replace FACP at Building 103 (Hangar)
    September, 2015
  • Install Petroleum Tank Randsburg Wash
    September, 2015
  • B-127 Paint the Outside of the Building
    September, 2015
  • SWD Compound Paint Outside of Buildings B-127
    September, 2015
  • B150 Paint Exterior
    September, 2015
  • Repair Power Feed to Sea Site 1 Facility 70127
    September, 2015
  • Install Conduit for Grounding Various CLPL/SW
    September, 2015
  • Demolish Abandoned NAVID, Facility 20281
    September, 2015
  • Repair D5 Pedestal Bldg. 15988
    September, 2015
  • Paint Exterior Bldg. 116
    July, 2015
  • Paint Exterior Bldg. 77
    July, 2015
  • Repair Plasma Cutter Bldg. 00991
    July, 2015
  • Repair Crane, Bldg. 15726
    July, 2015
  • Repair and Paint Hallways in Bldg. 02466
    July, 2015
  • Install EM Door Holders Doors 1030 and 2103
    July, 2015
  • AFFF Removal Hangar 97
    July, 2015
  • Paint Metal Roofs B337, B3121, B3122, and B3341
    July, 2015
  • B77 Paint Exterior
    July, 2015
  • B3142 Paint Exterior and Replace Blinds
    July, 2015
  • Replace Air Bladder Doors Bldg. 00005
    July, 2015
  • Repair Fire Alarm System Building 20303
    June, 2015
  • Design Build Install Generator Bldg. 7065
    June, 2015
  • Replace Sliding Doors Building 01395
    June, 2015
  • Replace Fire Alarm Systems Bldg. 01028, 01029, and 01032
    June, 2015
  • Repair Roof Bldg. 20267
    June, 2015
  • Replace Sunshades Bldg. 01181S
    May, 2015
  • Repair Roofs of Bldgs. 12010 & 12020
    May, 2015
  • Replace Fire Pump and Install Backflow Preventer at Bldg. 109
    May, 2015
  • Install Air Curtains Building 300
    April, 2015
  • Paint Mechanical Room Bldg. 3202
    April, 2015
  • Repair Berms, Building 31126
    April, 2015
  • Fire Suppression System Repairs to Building 508
    April, 2015
  • Repair Eleven Backflow Preventers
    April, 2015
  • Provide Backup Power Source for Building 20009
    April, 2015
  • Repairs to Roll Up Door Bldg. 70150
    December, 2014
  • Install Door Interlock System Bldg. 20000
    November, 2014
  • Barbours Cut C-6 Reconfiguration
    October, 2014
  • Repair Replace Fire Alarm Control Panel at Hangar 95
    October, 2014
  • Troubleshoot and Repair the Fire Alarm Control Panel in Bldgs. 918 and 920
    October, 2014
  • Repair Fire Suppression System Bldg. 31198
    September, 2014
  • Replace Two Suppression Valves, Bldg. 15590
    September, 2014
  • Optimization of HVAC System at Bldg. 5160
    September, 2014
  • Upgrade Fleet Support Division Facility Bldg. 551
    September, 2014
  • Install new LED Display Sign System, All Faith Chapel, Bldg. 02601
    September, 2014
  • Repair Floor and Wall, Bldg. 15760
    September, 2014
  • Various Repairs Bldg. 02480
    September, 2014
  • Replace the Fire Alarm Control Panel at Bldg. 1700
    September, 2014
  • Design Build for Renovate HVAC Bldg. 224
    September, 2014
  • Upgrade Lightning Protection System
    September, 2014
  • Remodel Storage Facility Building 347
    September, 2014
  • Runway Stabilization
    September, 2014
  • Install Bird Protection at Kennels
    September, 2014
  • Repair Sidewalk at Parade Field Bldg. 2484
    September, 2014
  • Fire Alarm Reporting System
    September, 2014
  • Renovate Space Optimization Various Rooms
    September, 2014
  • Lincoln Boyhood National Memorial Pavement Preservation Project
    September, 2014
  • Roybal Elevator Modernization Project 3
    September, 2014
  • Repair Concrete Wall, Bldg. 20001
    September, 2014
  • Replace HVAC System Bldg. 2296
    August, 2014
  • Repair Leaking Heating Water Pipe, Bldg. 02720
    June, 2014
  • Install Drive Thru Gate, PW Compound
    June, 2014
  • Low Use RPM Removal- SE Region
    June, 2014
  • Elevated Water Tower #2 and #5 Painting and Repairs
    June, 2014
  • Maintain Fire Systems
    May, 2014
  • Repair Fire Alarm System Bldg 43
    May, 2014
  • Low Use RPM Removal SW Region
    May, 2014
  • Sink, Shower, and Toilet Modifications
    May, 2014
  • Replace UPS System Bldg. 00994
    May, 2014
  • Paint Exterior of Bldg. 00001
    May, 2014
  • Construct Covered Walkway, Bldg. 01495
    May, 2014
  • Convert or Replace Automatic Doors at Main and North Entry Bldg. 00005
    May, 2014
  • Repair Leaks in Fire Protection System Bldg. 20000
    April, 2014
  • Repair L Retaining Waill Bldg. 31178
    April, 2014
  • Fire Suppression System and Restroom Renovation
    April, 2014
  • Repair/Replace the Backflow Preventers in Eleven (11) Buildings
    April, 2014
  • Repair Fire Suppression Air Compressor and Repair Fire Alarm System at Bldg. 408
    April, 2014
  • Repair the Fire Suppression/Alarm System in Bldg. 328
    April, 2014
  • Repair Fire Alarm Control Panel Issues in Bldg 661, 223 and 711
    April, 2014
  • Replace Trim Piping, PRV and Remove Agent Release Station in Hangar 95
    April, 2014
  • Remove Battery Chargers in Fire Pump Controller in Bldg. 315
    April, 2014
  • Repair the Fire Alarm Control Panel in Bldg. 406
    April, 2014
  • Repair Fire Alarm in Bldg. 460
    April, 2014
  • Fire Suppression Repairs to Seven (7) Bldgs.
    April, 2014
  • Replace Fire Alarm Check Valve, Trim Piping and Gauges in Bldg. 3238
    April, 2014
  • Repair Fire Pumps in Bldg 6004 Replace Sprinkler Piping Manifold in Bldg. 6009
    April, 2014
  • Refresh Public Corridor to Include New Carpet and Wall Covering
    March, 2014
  • Design Build Renovation for Building 913
    February, 2014
  • Gamewell 6 Interior and Exterior Fire Alarm Replacements at Point Mugu Naval Base Ventura County
    February, 2014
  • Replace Fire Alarm System Building 44
    January, 2014
  • Fire Protection and Life Safety Upgrades
    January, 2014
  • Repair Heating System Multiple Facilities
    January, 2014
  • Sink, Shower, and Toilet Modifications
    January, 2014
  • Design Build Fire Alarm Modifiction at NOSC Alameda, NOSC Sacramento and NOSC San Jose
    January, 2014
  • Multiple Fire Pumps Testing and Certification
    January, 2014
  • Repair Gamewell 5 Fire Alarm System
    January, 2014
  • Remove and Install Pavement
    January, 2014
  • Repair Leaking Fire Suppression System in Overhead at 310904
    January, 2014
  • Repair Indicator Valve at Building 1330
    January, 2014
  • Repair Shelf Road 52 Area
    January, 2014
  • Resurface Asphalt at Building 22160
    January, 2014
  • Replace Asphalt at 17th Street and Vandegrift Blvd.
    January, 2014
  • Repair and Replace Street Lights 31 Area
    January, 2014
  • Install Power Poles at Building 2246
    January, 2014
  • Replace Missing Light Poles at Building 2246
    January, 2014
  • Replace Solar Traffic Lights at 22 Area
    January, 2014
  • Install Power for New Building at R116
    January, 2014
  • Install Additional Lights at the Vehicle Lot at Building 2242
    January, 2014
  • Install Light Poles at Building 520594
    January, 2014
  • Repair Laundry Room Main Exhaust at Building 43045
    January, 2014
  • Relocate Electrical Panels at Building 31331A
    January, 2014
  • Replace Exhaust Fan in Building 210846
    January, 2014
  • Repair Replace HVAC System in Building 62305
    January, 2014
  • Install AC System for New Server Room at Building 1139
    January, 2014
  • Repair Fire Alarm at Building 140178
    January, 2014
  • Install Time Flashing Crosswalk at Intersection in the 43 Area
    January, 2014
  • Repair Elite Vehicular Gate Operator at Building 620352
    January, 2014
  • Weld Grounding Wires at Building 43979
    January, 2014
  • Replace Electrical Transformer at Building 520442
    January, 2014
  • Replace HVAC System at Building 2291
    January, 2014
  • Install Swipe Card Door Lock at Building 620520
    January, 2014
  • Install Security Barrier Building 43950
    January, 2014
  • Replace Electrical Transformer at Building 520420
    January, 2014
  • Replace A/C System in Building 32940
    January, 2014
  • Replace Broken Door at Building 140090
    January, 2014
  • Repair Multiple Fire Systems at Building 310906
    January, 2014
  • Repair Electrical Target Systems at Range 409
    January, 2014
  • Install Range Flag Poles with Warning Lights
    January, 2014
  • Install Additional Security Lighting at Del Mar Gate
    January, 2014
  • Install Multiple Electrical Connections for Cutting Machine in Welding Shop
    January, 2014
  • Install Two Lighted Cross Walks in 52 Area
    January, 2014
  • Replace Pad Mount Transformer B-62302
    January, 2014
  • Demo and Replace Asphalt at Building 13164
    January, 2014
  • Repair Culverts, Construct Asphalt Foot Path and Retaining Wall at 43 Area Ammunition Supply Point
    January, 2014
  • Repair Kraus Road at 21 Area
    January, 2014
  • Repair Asphalt at Building 1663
    January, 2014
  • Encapsulate Mold Building 01403
    January, 2014
  • Security Alterations to Building 20303
    January, 2014
  • Repair Roof and Other Interior Tasks Building 10420
    January, 2014
  • Paint Exterior of Building 14535
    January, 2014
  • RPM Decommissioning, Removal and Transfer of RPM Equipment Port Canaveral and Fort Pierce FL
    January, 2014
  • Replace Fire Alarm System Building 1309
    December, 2013
  • Replace Outdated/Inoperative Fire Alarms
    December, 2013
  • Replace Fire Alarm Equipment in 148 Buildings
    December, 2013
  • Traffic Analysis Study at the Barbour’s Cut Seaport in Houston, TX
    December, 2013
  • Gate Arm Installation at Long Beach, CA
    December, 2013
  • Install OIT Infrastructure Upgrades for CBP at Los Angeles/Long Beach Seaport Sites
    December, 2013
  • Install Advanced Spectroscopic Portable (ASP) Monitoring System at the Cargo Secondary Inspection Area Weigh Station
    December, 2013
  • Support Fire Safety Demands
    December, 2013
  • Modify Fire Sprinkler System Provide/Install Fire Alarm Building 45
    December, 2013
  • Perform Routine Inspections, Test and Preventive Maintenance on Base Fire Suppression, Fire Alarm’s and Hood Systems
    December, 2013
  • Install RLSO Public Address System
    December, 2013
  • Install CO2 Fire Suppression System Under the Floor Building 605
    December, 2013
  • Relocate Fire Hydrants at Building 1666 and Building 1766
    December, 2013
  • Indefinite Delivery Indefinite Quantity for Station Fire Alarm and Fire Suppression Systems
    December, 2013
  • Inspect Test and Maintenance on Base Fire Suppression, Fire Alarm’s and Hood System
    December, 2013
  • Semi-Annual Kitchen Hood System Inspections-21 Systems
    December, 2013
  • Poly Trauma Fire Sprinkler Suppression System
    December, 2013
  • Design-Build MI1041M Repair Fire Protection at Bldg. 8656
    December, 2013
  • Indefinite Delivery Indefinite Quantity for Flooring at Yuma Proving Ground, AZ
    December, 2013
  • Indefinite Delivery Indefinite Quantity for Painting and Stucco at Yuma Proving Ground, AZ
    December, 2013
  • Monthly Inspection of Fire Suppression Systems
    December, 2013
  • Repair and Maintenance of Fire Suppression Systems
    December, 2013
  • Install Low-E Windows Building in Multiple Buildings
    December, 2013
  • Repair Fire Alarm System in Building 20279
    December, 2013
  • Repair Restroom Building 70004
    December, 2013
  • Replace Exterior Lights Base Wide
    December, 2013
  • Install Backup Generator, B-Mountain Radio Transmitter Building 01397
    December, 2013
  • Replace Flooring Building 01403
    December, 2013
  • Install Precision Approach Path Indicator RW 03/21
    December, 2013
  • Replace Cooling Towers SS Wing Building 00005
    December, 2013
  • Install Taxiway End Lights
    December, 2013
  • Security Upgrades to Bay 4 in Range Control Center Building 31455
    December, 2013
  • Electrical Repairs at Fire House #3 Building 20009
    December, 2013
  • Alterations to Control Room Building 16079
    December, 2013
  • Various Repairs to Building 20195
    December, 2013
  • Repairs to Buildings 15800 and 15954
    December, 2013
  • Construct Service Area Building 00022
    December, 2013
  • Construct Stairs to H-12 Radar Pad at Bear West
    December, 2013
  • Replace HVAC Building 11010
    December, 2013
  • Repair HVEC Building 11080
    December, 2013
  • Repair Arresting Gear Signs
    December, 2013
  • Repairs to Room 404 Building 31455
    December, 2013
  • Repair Doors Building 31000
    December, 2013
  • Floor Repairs Building 02640, Mainsite
    December, 2013
  • Lead Paint Remediation Building 00989 Crane Maintenance Shop Area
    December, 2013
  • Demo Building 20162 at X-Pad Airfield
    December, 2013
  • Provide Floor Coating Room 144 Building 70150 RW
    December, 2013
  • Replace Air Vessels Building 20000
    December, 2013
  • Repair and Paint Walls and Ceilings Building 20000
    December, 2013
  • Replace Water Heater in Building 00005
    December, 2013
  • Demo Building 91076 at Midas Site Airfield
    December, 2013
  • Upgrade Lights at Various Buildings
    December, 2013
  • Construct Dividing Wall in Pool Area Building 00022
    December, 2013
  • Dust Abatement BRAC Trailer Site
    December, 2013
  • Replace Chiller Buildings 00452 and 00453
    December, 2013
  • Repair Automatic Doors Building 01403
    December, 2013
  • Sound Attenuation Room 118 Building 01403
    December, 2013
  • Expand Fence North of Building 11100
    December, 2013
  • Refinish Hardwood Floors Building 00021, 00022, and 02480
    December, 2013
  • Replace Doors with Automatic Doors Building 01400
    December, 2013
  • Repair Boiler #5 Building 01016
    December, 2013
  • Repair Overhead Crane in Building 20001
    December, 2013
  • Repair Range Control Center Fire Suppression System
    December, 2013
  • Repair Drainage Issues Building 20279
    December, 2013
  • Repair a Single Roof Truss in Building 00500
    December, 2013
  • Install 2 Each 100A Safety Switches in the 43 Area
    December, 2013
  • Reconstruct Parade Ground and Parking Lot in 53 Area
    December, 2013
  • Repair Damaged Culver in 11 Area
    December, 2013
  • Replace Concrete Pool Deck at Building 1315
    December, 2013
  • Fire Suppression System Pump House 229 San Nicolas Island
    December, 2013
  • Repair Fillstand Access Road
    December, 2013
  • Construct Suspect Vehicle Holding Area
    December, 2013
  • Design-Build Installation of New Fire Alarm System
    December, 2013
  • Design Build Fire Alarm and Mass Notification System Building 1405
    December, 2013
  • Modify Fire Sprinkler System Provide/Install Fire Alarm/Mass Notification System Building 45
    December, 2013
  • Replace Existing Steel Natural Gas Line with HDPE at 210802
    December, 2013
  • Correct Erosion Problem at Building 41409
    December, 2013
  • Site Prep and Electrical for Portable Arms Rooms
    December, 2013
  • Repair Roof System Building 822
    December, 2013
  • North Charleston (Redeployment)
    December, 2013
  • RPM Installation at Walpole-Algonac Ferry Crossing
    December, 2013
  • RPM Installation at Freeport Terminal
    December, 2013
  • Design Build 5c Wireless Tower and Equipment Port of Galveston
    December, 2013
  • Design Build 5c Wireless Tower and Equipment Port of Houston
    December, 2013
  • RPM Installation at Jacinto Port Houston TX
    December, 2013
  • RPM Installation at Greens Port Industrial Park Terminal Houston TX
    December, 2013
  • Indefinite Delivery Indefinite Quantity (IDIQ) for Flooring at the Naval Base Ventura County Located at Port Hueneme, Point Mugu, San Nicolas Island, Santa Cruz Island, Laguna Peak and Portions of Fort Hunter Liggett, CA
    December, 2013
  • RPM Installation at Port of Lake Charles City Docks Lake Charles LA
    December, 2013
  • RPM Installation at Port of New York/New Jersey
    December, 2013
  • RPM Installation at Sandusky Ferry Crossing
    December, 2013
  • Construct Fire Station Storage Area B749
    December, 2013
  • RPM Installation at Barbours Cut Terminal L-Street Truck Exit Port of Houston, Houston,TX
    December, 2013
  • Roybal Daily Elevator Maintenance
    December, 2013
  • DEA Restroom Renovations
    December, 2013
  • Roybal Elevator Modernization Phase II
    December, 2013
  • RPM Installation at Marine City
    December, 2013
  • Repair Failed Fire Protection System Hangar 7027
    December, 2013
  • Repair West Side of MTCSSA Bridge
    December, 2013
  • Replace Cooling Towers and Evaporative Cooling Units in Building 02466
    December, 2013
  • Demo Anechoic Chamber Room B29B Building 01400
    December, 2013
  • Fire Alarms and Mass Notification System Replacement
    December, 2013
  • RPM Installation at 40th Street and 16th Street Exit Gates
    December, 2013
  • Renovate Hangar 6
    December, 2013
  • Roybal Elevator Modernization Phase I
    December, 2013
  • High Velocity Air Flow System for the Live Fire Survivability Test
    April, 2013
  • Design/Build Rotator Table and Sprung Structure
    April, 2013
  • Digital Airport Surveillance Radar – Tolicha Peak
    April, 2013
  • Installation of a Radiation Portal
    April, 2013
  • Fire Protection Test and Inspection Contract
    April, 2013
  • Fire Protection Test and Inspection Contract
    April, 2013
  • Design Build Addition to Bldg 1950
    April, 2013
  • RPM Installations at Detroit – Blue Water and Algonac
    April, 2013
  • Design Build Sea Wells at San Nicolas Is.
    April, 2013
  • Design Build Mass Notification System
    April, 2013
  • Design-Build Magazine Access Improvements
    April, 2013
  • Repair Existing Homeruns for Airfield Lighting
    April, 2013
  • Replace Fire Alarm Hangar 811
    April, 2013
© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS