It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’, making it look like readable English.
Projects
- All Categories (403)
- Civil (38)
- Electrical (169)
- General Construction (328)
- Life, Safety & Security (96)
- Mechanical (10)
-
Commercial Outbound Inbound Railing RepairJuly, 2020
-
Parking Lot Reseal and RestripeJune, 2020
-
Mechanical Shop PaintingJune, 2020
-
Fire Suppression Services Public Announcement System RepairMay, 2020
-
Agicultural Office Tenant ImprovementsApril, 2020
-
EVO Chamber 5650 RefurbishmentApril, 2020
-
Design Build Repair by Replacement of Fire Alarm System BLDG. 625March, 2020
-
Design Build Replace Electrical Substaions at MCRDMarch, 2020
-
USDA PACA RemodelMarch, 2020
-
MAP K105 BRGMarch, 2020
-
Replace Blast Door System at the Lloyd D. Geroge USCHMarch, 2020
-
EVO DeConcini Office Carpet and PaintMarch, 2020
-
SDO Misc. Patch and Paint ProjectsNovember, 2019
-
HDA-50 Repair Fire Protection SystemNovember, 2019
-
Main Gate Entrace Temporary OfficeOctober, 2019
-
Install a Physical Range Control OfficeSeptember, 2019
-
Earthquake Repairs Bldg. 00019 and Bldg. 20001September, 2019
-
Windows and Doors RestorationSeptember, 2019
-
Paint Exterior Doors and LouversSeptember, 2019
-
Sandquist Gate Enhancement Bldg. 02465September, 2019
-
Fire Suppression Upgrade Camp Billy MachenSeptember, 2019
-
Windows and Doors RestorationSeptember, 2019
-
Elevator 7 & 8 ModernizationSeptember, 2019
-
Fire Suppression Services Abatement of AFFFSeptember, 2019
-
FY19 3rd Qtr. Fire Suppression RepairSeptember, 2019
-
USMC Basement Sally Port TerrazzoSeptember, 2019
-
MAP Reservoir Fence InstallationSeptember, 2019
-
Chamber 421 and 524 RefurbishmentJuly, 2019
-
CAAA Bldgs 145 and 148 Infill WindowsJune, 2019
-
CAAA Bldg 3149 Painting North/South Test Cell BJune, 2019
-
Replace Electrical Supporting Mission ControlApril, 2019
-
CIB Flooring ReplacementFebruary, 2019
-
Repair Fire Sprinkler System Bldg. 15754January, 2019
-
Repair Security Lights Bldg. 31047December, 2018
-
USDC SDO Pretrial Carpet and VCT 2-Room ConversionNovember, 2018
-
Walsh Lobby Wall Monitor InstallationNovember, 2018
-
Judges Elevator RefreshNovember, 2018
-
LA/LB Remote Operations Phase 1October, 2018
-
CAAA Bldg. 2540 Replace Awnings and Install BollardsOctober, 2018
-
Off-Installation Security Improvements at Four FacilitiesOctober, 2018
-
Bldg. 3234 Clean Room / C-Scan and Sanding BoothOctober, 2018
-
Bldg. 3006 Renovate Exterior and Paint TestOctober, 2018
-
Provide AFFF to PM362 for Fire ScoutOctober, 2018
-
NBPL-500 Remove Ansul System Install a Hood and FSSOctober, 2018
-
Fire Alarm Control Panel RepairAugust, 2018
-
Fire Suppression Service and RepairAugust, 2018
-
Fire Alarm Extension Bldg. 220August, 2018
-
Install Power Supplies for AWIL AIRCAugust, 2018
-
Install Power Supplies for AWIL Aircraft Bldgs. 20242 & 20279August, 2018
-
Pre Trial Carpet ReplacementJuly, 2018
-
Replace San Luis Emergency GeneratorJuly, 2018
-
Replace Emergency Generator Douglas, AZJuly, 2018
-
VIG Portsmouth RO UpgradeMay, 2018
-
Replace CarpetMarch, 2018
-
Replace Michelson Lab Substation at NAWS, China Lake, CAMarch, 2018
-
NSA B10 Renovation of Security AreaFebruary, 2018
-
Replace Bravo Pier Fire PumpFebruary, 2018
-
San Luis 2 Concrete and Air TubeFebruary, 2018
-
Naco Design Build Perimeter LightingFebruary, 2018
-
Cincinnati IMF Ludlum to Leidos ConverstionJanuary, 2018
-
Design Build Fallon Various Airfield Lighting RepairsDecember, 2017
-
Repair Multiple Buidlings with Various Fire Suppression SystemsNovember, 2017
-
Repair North Range Electrical DistributionNovember, 2017
-
Construct Ready Service MagazineNovember, 2017
-
Repair Water Drainage B-499 (D-Wing)October, 2017
-
Grounding Points in Hangar 157, 80, 76, and 75October, 2017
-
Repair Photovoltaic System Facility NOS. 33056September, 2017
-
Design- Build, Arresting Net System and LightsSeptember, 2017
-
San Luis I Combined ProjectsSeptember, 2017
-
Provide Back-Up Generator to Bldg. 20286September, 2017
-
Paint the Cargo Dock East and South SideSeptember, 2017
-
3330C Atrium Sound AbatementAugust, 2017
-
B3168 Paint Main Hallways and Install Vinyl Cove BaseAugust, 2017
-
Phibcor 209 Interior Lighting RetrofitAugust, 2017
-
Paint Exterior Bldg. 2412June, 2017
-
Paint Exterior Bldg. 3700June, 2017
-
Paint Exterior Bldg. 1210June, 2017
-
Paint Exterior Bldg. 1207June, 2017
-
Paint Exterior Bldg. 2810June, 2017
-
Paint Exterior Bldg. 2660June, 2017
-
Paint Exterior Bldg. 3804June, 2017
-
Power for CIP Virtual Simulation (D41R1006)June, 2017
-
Renovate Randolph Golf Club Snack BarMay, 2017
-
Repair Fire Alarm System Bldg. 02308May, 2017
-
Replace 34.5 KV UG RA Conductor CableApril, 2017
-
Fire Suppression Replace Fire Pump in Building 1700February, 2017
-
USDC Grand Jury AVJanuary, 2017
-
Convert 13 Lanes of RPM’s from Ludlum to Leidos UnitsJanuary, 2017
-
Repair Anechoic Chamber Fire System Bldg. 00005January, 2017
-
Fire Suppression Building 109 Remove Three IR DetectorsJanuary, 2017
-
LUNU RPM RemovalJanuary, 2017
-
Emergency High Voltage Repair Baker RangeDecember, 2016
-
Convert Water Treatment Plant System Bldg. 02694December, 2016
-
RM15-2815 Repair and Upgrade SNI 319November, 2016
-
Fire Alarm and Fire SprinklerNovember, 2016
-
Decommission Radiation Portal Monitors at Land Ports of Entry in Vermont and MaineOctober, 2016
-
FACP Replacement at Building 240October, 2016
-
Install Fire Alarm in Building 4000October, 2016
-
Paint Exterior Building 6000October, 2016
-
Paint Interior Room 142-Building 145October, 2016
-
Paint Exterior Bldg. 2419October, 2016
-
Cathodic Proteciton Bldg. 20275October, 2016
-
Paint Exterior Building 6030October, 2016
-
Design Build Repair Fire Suppression System to FOTS Hub in the Michelson Lab BuildingSeptember, 2016
-
JBSA Lackland Airfield Crack RepairSeptember, 2016
-
Expand Communication Infrastructure-MDMC Yermo AnnexSeptember, 2016
-
Fire Suppression Replace Fire Alarm Panel Building 1020September, 2016
-
FSS-FA Repairs Building 3340 ALFSeptember, 2016
-
Replace Chiller Bldg. 00947September, 2016
-
Repair by Replacement of NAF SubstationSeptember, 2016
-
PE15321R Connect 52 and 62 Areas Electrical Distribution SystemsSeptember, 2016
-
Electrical System Distribution for Landslide MitigationSeptember, 2016
-
Paint Exterior Bldg. 3497September, 2016
-
PE14066M Repair the Fire Alarm System Bldg. 210440 (BOQ)September, 2016
-
Fire and Life Safety Systems Service AgreementSeptember, 2016
-
Decommission Radiation Portal Monitors at Lewiston Bridge, New YorkSeptember, 2016
-
Relocate Ground-Air Transmit-Receive Switch (GATR) Facility 715September, 2016
-
Construct Restrooms at Danville Test PadAugust, 2016
-
Maintain Floor Building 2209July, 2016
-
Install Circuits Building 00005July, 2016
-
Various Building Fire Alarm RepairsJune, 2016
-
Repair Exhaust Systems, Bowling CenterJune, 2016
-
Repair Overhead Slate Range Power LinesJune, 2016
-
Paint Exterior B4493, 4494, 4496 and 4505June, 2016
-
Modify Room 302, Building 00005May, 2016
-
Replace Energy Lighting Control, Bldg. 00010May, 2016
-
Install Boiler Bldg. 01016 (FAR PWCL0105)May, 2016
-
FSS RepairsMay, 2016
-
Increase Power to Bldg. 31462April, 2016
-
Paint Interior Bldg. 4456April, 2016
-
Paint Interior Building B5560April, 2016
-
Paint Exterior Bldg. 1630April, 2016
-
Paint Exterior Bldg. 1600April, 2016
-
Install GQM-163 Launcher for NAWCWD at San Nicolas IslandApril, 2016
-
Paint Exterior Bldg. 1414April, 2016
-
Various Repairs to Building 11100February, 2016
-
Repair HVAC DampersJanuary, 2016
-
Provide Backup Power, Main Gate AreaJanuary, 2016
-
Repair Fire Alarm System, Building 20001January, 2016
-
Emergency Repair Calls for High Voltage Electrical Distribution SystemsJanuary, 2016
-
Paint Exterior Building 1634December, 2015
-
Install Shade Canopies at Slagel Dining Facility Bldg. 1287October, 2015
-
Carpet Removal Installation B1199 Room 114October, 2015
-
Paint Exterior Bldg. 1634October, 2015
-
Installation of Fire Protection System PH1201September, 2015
-
Replace FACP at Building 103 (Hangar)September, 2015
-
Install Petroleum Tank Randsburg WashSeptember, 2015
-
B-127 Paint the Outside of the BuildingSeptember, 2015
-
SWD Compound Paint Outside of Buildings B-127September, 2015
-
B150 Paint ExteriorSeptember, 2015
-
Repair Power Feed to Sea Site 1 Facility 70127September, 2015
-
Install Conduit for Grounding Various CLPL/SWSeptember, 2015
-
Demolish Abandoned NAVID, Facility 20281September, 2015
-
Repair D5 Pedestal Bldg. 15988September, 2015
-
Paint Exterior Bldg. 116July, 2015
-
Paint Exterior Bldg. 77July, 2015
-
Repair Plasma Cutter Bldg. 00991July, 2015
-
Repair Crane, Bldg. 15726July, 2015
-
Repair and Paint Hallways in Bldg. 02466July, 2015
-
Install EM Door Holders Doors 1030 and 2103July, 2015
-
AFFF Removal Hangar 97July, 2015
-
Paint Metal Roofs B337, B3121, B3122, and B3341July, 2015
-
B77 Paint ExteriorJuly, 2015
-
B3142 Paint Exterior and Replace BlindsJuly, 2015
-
Replace Air Bladder Doors Bldg. 00005July, 2015
-
Repair Fire Alarm System Building 20303June, 2015
-
Design Build Install Generator Bldg. 7065June, 2015
-
Replace Sliding Doors Building 01395June, 2015
-
Replace Fire Alarm Systems Bldg. 01028, 01029, and 01032June, 2015
-
Repair Roof Bldg. 20267June, 2015
-
Replace Sunshades Bldg. 01181SMay, 2015
-
Repair Roofs of Bldgs. 12010 & 12020May, 2015
-
Replace Fire Pump and Install Backflow Preventer at Bldg. 109May, 2015
-
Install Air Curtains Building 300April, 2015
-
Paint Mechanical Room Bldg. 3202April, 2015
-
Repair Berms, Building 31126April, 2015
-
Fire Suppression System Repairs to Building 508April, 2015
-
Repair Eleven Backflow PreventersApril, 2015
-
Provide Backup Power Source for Building 20009April, 2015
-
Repairs to Roll Up Door Bldg. 70150December, 2014
-
Install Door Interlock System Bldg. 20000November, 2014
-
Barbours Cut C-6 ReconfigurationOctober, 2014
-
Repair Replace Fire Alarm Control Panel at Hangar 95October, 2014
-
Troubleshoot and Repair the Fire Alarm Control Panel in Bldgs. 918 and 920October, 2014
-
Repair Fire Suppression System Bldg. 31198September, 2014
-
Replace Two Suppression Valves, Bldg. 15590September, 2014
-
Optimization of HVAC System at Bldg. 5160September, 2014
-
Upgrade Fleet Support Division Facility Bldg. 551September, 2014
-
Install new LED Display Sign System, All Faith Chapel, Bldg. 02601September, 2014
-
Repair Floor and Wall, Bldg. 15760September, 2014
-
Various Repairs Bldg. 02480September, 2014
-
Replace the Fire Alarm Control Panel at Bldg. 1700September, 2014
-
Design Build for Renovate HVAC Bldg. 224September, 2014
-
Upgrade Lightning Protection SystemSeptember, 2014
-
Remodel Storage Facility Building 347September, 2014
-
Runway StabilizationSeptember, 2014
-
Install Bird Protection at KennelsSeptember, 2014
-
Repair Sidewalk at Parade Field Bldg. 2484September, 2014
-
Fire Alarm Reporting SystemSeptember, 2014
-
Renovate Space Optimization Various RoomsSeptember, 2014
-
Lincoln Boyhood National Memorial Pavement Preservation ProjectSeptember, 2014
-
Roybal Elevator Modernization Project 3September, 2014
-
Repair Concrete Wall, Bldg. 20001September, 2014
-
Replace HVAC System Bldg. 2296August, 2014
-
Repair Leaking Heating Water Pipe, Bldg. 02720June, 2014
-
Install Drive Thru Gate, PW CompoundJune, 2014
-
Low Use RPM Removal- SE RegionJune, 2014
-
Elevated Water Tower #2 and #5 Painting and RepairsJune, 2014
-
Maintain Fire SystemsMay, 2014
-
Repair Fire Alarm System Bldg 43May, 2014
-
Low Use RPM Removal SW RegionMay, 2014
-
Sink, Shower, and Toilet ModificationsMay, 2014
-
Replace UPS System Bldg. 00994May, 2014
-
Paint Exterior of Bldg. 00001May, 2014
-
Construct Covered Walkway, Bldg. 01495May, 2014
-
Convert or Replace Automatic Doors at Main and North Entry Bldg. 00005May, 2014
-
Repair Leaks in Fire Protection System Bldg. 20000April, 2014
-
Repair L Retaining Waill Bldg. 31178April, 2014
-
Fire Suppression System and Restroom RenovationApril, 2014
-
Repair/Replace the Backflow Preventers in Eleven (11) BuildingsApril, 2014
-
Repair Fire Suppression Air Compressor and Repair Fire Alarm System at Bldg. 408April, 2014
-
Repair the Fire Suppression/Alarm System in Bldg. 328April, 2014
-
Repair Fire Alarm Control Panel Issues in Bldg 661, 223 and 711April, 2014
-
Replace Trim Piping, PRV and Remove Agent Release Station in Hangar 95April, 2014
-
Remove Battery Chargers in Fire Pump Controller in Bldg. 315April, 2014
-
Repair the Fire Alarm Control Panel in Bldg. 406April, 2014
-
Repair Fire Alarm in Bldg. 460April, 2014
-
Fire Suppression Repairs to Seven (7) Bldgs.April, 2014
-
Replace Fire Alarm Check Valve, Trim Piping and Gauges in Bldg. 3238April, 2014
-
Repair Fire Pumps in Bldg 6004 Replace Sprinkler Piping Manifold in Bldg. 6009April, 2014
-
Refresh Public Corridor to Include New Carpet and Wall CoveringMarch, 2014
-
Design Build Renovation for Building 913February, 2014
-
Gamewell 6 Interior and Exterior Fire Alarm Replacements at Point Mugu Naval Base Ventura CountyFebruary, 2014
-
Replace Fire Alarm System Building 44January, 2014
-
Fire Protection and Life Safety UpgradesJanuary, 2014
-
Repair Heating System Multiple FacilitiesJanuary, 2014
-
Sink, Shower, and Toilet ModificationsJanuary, 2014
-
Design Build Fire Alarm Modifiction at NOSC Alameda, NOSC Sacramento and NOSC San JoseJanuary, 2014
-
Multiple Fire Pumps Testing and CertificationJanuary, 2014
-
Repair Gamewell 5 Fire Alarm SystemJanuary, 2014
-
Remove and Install PavementJanuary, 2014
-
Repair Leaking Fire Suppression System in Overhead at 310904January, 2014
-
Repair Indicator Valve at Building 1330January, 2014
-
Repair Shelf Road 52 AreaJanuary, 2014
-
Resurface Asphalt at Building 22160January, 2014
-
Replace Asphalt at 17th Street and Vandegrift Blvd.January, 2014
-
Repair and Replace Street Lights 31 AreaJanuary, 2014
-
Install Power Poles at Building 2246January, 2014
-
Replace Missing Light Poles at Building 2246January, 2014
-
Replace Solar Traffic Lights at 22 AreaJanuary, 2014
-
Install Power for New Building at R116January, 2014
-
Install Additional Lights at the Vehicle Lot at Building 2242January, 2014
-
Install Light Poles at Building 520594January, 2014
-
Repair Laundry Room Main Exhaust at Building 43045January, 2014
-
Relocate Electrical Panels at Building 31331AJanuary, 2014
-
Replace Exhaust Fan in Building 210846January, 2014
-
Repair Replace HVAC System in Building 62305January, 2014
-
Install AC System for New Server Room at Building 1139January, 2014
-
Repair Fire Alarm at Building 140178January, 2014
-
Install Time Flashing Crosswalk at Intersection in the 43 AreaJanuary, 2014
-
Repair Elite Vehicular Gate Operator at Building 620352January, 2014
-
Weld Grounding Wires at Building 43979January, 2014
-
Replace Electrical Transformer at Building 520442January, 2014
-
Replace HVAC System at Building 2291January, 2014
-
Install Swipe Card Door Lock at Building 620520January, 2014
-
Install Security Barrier Building 43950January, 2014
-
Replace Electrical Transformer at Building 520420January, 2014
-
Replace A/C System in Building 32940January, 2014
-
Replace Broken Door at Building 140090January, 2014
-
Repair Multiple Fire Systems at Building 310906January, 2014
-
Repair Electrical Target Systems at Range 409January, 2014
-
Install Range Flag Poles with Warning LightsJanuary, 2014
-
Install Additional Security Lighting at Del Mar GateJanuary, 2014
-
Install Multiple Electrical Connections for Cutting Machine in Welding ShopJanuary, 2014
-
Install Two Lighted Cross Walks in 52 AreaJanuary, 2014
-
Replace Pad Mount Transformer B-62302January, 2014
-
Demo and Replace Asphalt at Building 13164January, 2014
-
Repair Culverts, Construct Asphalt Foot Path and Retaining Wall at 43 Area Ammunition Supply PointJanuary, 2014
-
Repair Kraus Road at 21 AreaJanuary, 2014
-
Repair Asphalt at Building 1663January, 2014
-
Encapsulate Mold Building 01403January, 2014
-
Security Alterations to Building 20303January, 2014
-
Repair Roof and Other Interior Tasks Building 10420January, 2014
-
Paint Exterior of Building 14535January, 2014
-
RPM Decommissioning, Removal and Transfer of RPM Equipment Port Canaveral and Fort Pierce FLJanuary, 2014
-
Replace Fire Alarm System Building 1309December, 2013
-
Replace Outdated/Inoperative Fire AlarmsDecember, 2013
-
Replace Fire Alarm Equipment in 148 BuildingsDecember, 2013
-
Traffic Analysis Study at the Barbour’s Cut Seaport in Houston, TXDecember, 2013
-
Gate Arm Installation at Long Beach, CADecember, 2013
-
Install OIT Infrastructure Upgrades for CBP at Los Angeles/Long Beach Seaport SitesDecember, 2013
-
Install Advanced Spectroscopic Portable (ASP) Monitoring System at the Cargo Secondary Inspection Area Weigh StationDecember, 2013
-
Support Fire Safety DemandsDecember, 2013
-
Modify Fire Sprinkler System Provide/Install Fire Alarm Building 45December, 2013
-
Perform Routine Inspections, Test and Preventive Maintenance on Base Fire Suppression, Fire Alarm’s and Hood SystemsDecember, 2013
-
Install RLSO Public Address SystemDecember, 2013
-
Install CO2 Fire Suppression System Under the Floor Building 605December, 2013
-
Relocate Fire Hydrants at Building 1666 and Building 1766December, 2013
-
Indefinite Delivery Indefinite Quantity for Station Fire Alarm and Fire Suppression SystemsDecember, 2013
-
Inspect Test and Maintenance on Base Fire Suppression, Fire Alarm’s and Hood SystemDecember, 2013
-
Semi-Annual Kitchen Hood System Inspections-21 SystemsDecember, 2013
-
Poly Trauma Fire Sprinkler Suppression SystemDecember, 2013
-
Design-Build MI1041M Repair Fire Protection at Bldg. 8656December, 2013
-
Indefinite Delivery Indefinite Quantity for Flooring at Yuma Proving Ground, AZDecember, 2013
-
Indefinite Delivery Indefinite Quantity for Painting and Stucco at Yuma Proving Ground, AZDecember, 2013
-
Monthly Inspection of Fire Suppression SystemsDecember, 2013
-
Repair and Maintenance of Fire Suppression SystemsDecember, 2013
-
Install Low-E Windows Building in Multiple BuildingsDecember, 2013
-
Repair Fire Alarm System in Building 20279December, 2013
-
Repair Restroom Building 70004December, 2013
-
Replace Exterior Lights Base WideDecember, 2013
-
Install Backup Generator, B-Mountain Radio Transmitter Building 01397December, 2013
-
Replace Flooring Building 01403December, 2013
-
Install Precision Approach Path Indicator RW 03/21December, 2013
-
Replace Cooling Towers SS Wing Building 00005December, 2013
-
Install Taxiway End LightsDecember, 2013
-
Security Upgrades to Bay 4 in Range Control Center Building 31455December, 2013
-
Electrical Repairs at Fire House #3 Building 20009December, 2013
-
Alterations to Control Room Building 16079December, 2013
-
Various Repairs to Building 20195December, 2013
-
Repairs to Buildings 15800 and 15954December, 2013
-
Construct Service Area Building 00022December, 2013
-
Construct Stairs to H-12 Radar Pad at Bear WestDecember, 2013
-
Replace HVAC Building 11010December, 2013
-
Repair HVEC Building 11080December, 2013
-
Repair Arresting Gear SignsDecember, 2013
-
Repairs to Room 404 Building 31455December, 2013
-
Repair Doors Building 31000December, 2013
-
Floor Repairs Building 02640, MainsiteDecember, 2013
-
Lead Paint Remediation Building 00989 Crane Maintenance Shop AreaDecember, 2013
-
Demo Building 20162 at X-Pad AirfieldDecember, 2013
-
Provide Floor Coating Room 144 Building 70150 RWDecember, 2013
-
Replace Air Vessels Building 20000December, 2013
-
Repair and Paint Walls and Ceilings Building 20000December, 2013
-
Replace Water Heater in Building 00005December, 2013
-
Demo Building 91076 at Midas Site AirfieldDecember, 2013
-
Upgrade Lights at Various BuildingsDecember, 2013
-
Construct Dividing Wall in Pool Area Building 00022December, 2013
-
Dust Abatement BRAC Trailer SiteDecember, 2013
-
Replace Chiller Buildings 00452 and 00453December, 2013
-
Repair Automatic Doors Building 01403December, 2013
-
Sound Attenuation Room 118 Building 01403December, 2013
-
Expand Fence North of Building 11100December, 2013
-
Refinish Hardwood Floors Building 00021, 00022, and 02480December, 2013
-
Replace Doors with Automatic Doors Building 01400December, 2013
-
Repair Boiler #5 Building 01016December, 2013
-
Repair Overhead Crane in Building 20001December, 2013
-
Repair Range Control Center Fire Suppression SystemDecember, 2013
-
Repair Drainage Issues Building 20279December, 2013
-
Repair a Single Roof Truss in Building 00500December, 2013
-
Install 2 Each 100A Safety Switches in the 43 AreaDecember, 2013
-
Reconstruct Parade Ground and Parking Lot in 53 AreaDecember, 2013
-
Repair Damaged Culver in 11 AreaDecember, 2013
-
Replace Concrete Pool Deck at Building 1315December, 2013
-
Fire Suppression System Pump House 229 San Nicolas IslandDecember, 2013
-
Repair Fillstand Access RoadDecember, 2013
-
Construct Suspect Vehicle Holding AreaDecember, 2013
-
Design-Build Installation of New Fire Alarm SystemDecember, 2013
-
Design Build Fire Alarm and Mass Notification System Building 1405December, 2013
-
Modify Fire Sprinkler System Provide/Install Fire Alarm/Mass Notification System Building 45December, 2013
-
Replace Existing Steel Natural Gas Line with HDPE at 210802December, 2013
-
Correct Erosion Problem at Building 41409December, 2013
-
Site Prep and Electrical for Portable Arms RoomsDecember, 2013
-
Repair Roof System Building 822December, 2013
-
North Charleston (Redeployment)December, 2013
-
RPM Installation at Walpole-Algonac Ferry CrossingDecember, 2013
-
RPM Installation at Freeport TerminalDecember, 2013
-
Design Build 5c Wireless Tower and Equipment Port of GalvestonDecember, 2013
-
Design Build 5c Wireless Tower and Equipment Port of HoustonDecember, 2013
-
RPM Installation at Jacinto Port Houston TXDecember, 2013
-
RPM Installation at Greens Port Industrial Park Terminal Houston TXDecember, 2013
-
Indefinite Delivery Indefinite Quantity (IDIQ) for Flooring at the Naval Base Ventura County Located at Port Hueneme, Point Mugu, San Nicolas Island, Santa Cruz Island, Laguna Peak and Portions of Fort Hunter Liggett, CADecember, 2013
-
RPM Installation at Port of Lake Charles City Docks Lake Charles LADecember, 2013
-
RPM Installation at Port of New York/New JerseyDecember, 2013
-
RPM Installation at Sandusky Ferry CrossingDecember, 2013
-
Construct Fire Station Storage Area B749December, 2013
-
RPM Installation at Barbours Cut Terminal L-Street Truck Exit Port of Houston, Houston,TXDecember, 2013
-
Roybal Daily Elevator MaintenanceDecember, 2013
-
DEA Restroom RenovationsDecember, 2013
-
Roybal Elevator Modernization Phase IIDecember, 2013
-
RPM Installation at Marine CityDecember, 2013
-
Repair Failed Fire Protection System Hangar 7027December, 2013
-
Repair West Side of MTCSSA BridgeDecember, 2013
-
Replace Cooling Towers and Evaporative Cooling Units in Building 02466December, 2013
-
Demo Anechoic Chamber Room B29B Building 01400December, 2013
-
Fire Alarms and Mass Notification System ReplacementDecember, 2013
-
RPM Installation at 40th Street and 16th Street Exit GatesDecember, 2013
-
Renovate Hangar 6December, 2013
-
Roybal Elevator Modernization Phase IDecember, 2013
-
High Velocity Air Flow System for the Live Fire Survivability TestApril, 2013
-
Design/Build Rotator Table and Sprung StructureApril, 2013
-
Digital Airport Surveillance Radar – Tolicha PeakApril, 2013
-
Installation of a Radiation PortalApril, 2013
-
Fire Protection Test and Inspection ContractApril, 2013
-
Fire Protection Test and Inspection ContractApril, 2013
-
Design Build Addition to Bldg 1950April, 2013
-
RPM Installations at Detroit – Blue Water and AlgonacApril, 2013
-
Design Build Sea Wells at San Nicolas Is.April, 2013
-
Design Build Mass Notification SystemApril, 2013
-
Design-Build Magazine Access ImprovementsApril, 2013
-
Repair Existing Homeruns for Airfield LightingApril, 2013
-
Replace Fire Alarm Hangar 811April, 2013
-