Design Build Sea Wells at San Nicolas Is. HomeDesign Build Sea Wells at San Nicolas Is.

Design Build Sea Wells at San Nicolas Is.

Design, build and redevelop seawells on SNI.

  • Implemented SET team approach
  • Able to work in variable and challenging logistical conditions
  • Interfaced extremely well with public works and FEAD teams
  • Offered and installed VA/VE design
  • Exceed all performance expectations
  • Performed within the initial contract intent without change order

(8212) Barge Loading - Soilmec, Trailer, & Tractor - 01.12.08 - 03 (1280x960) (8212) Barge Loading - Soilmec, Trailer, & Tractor - 01.12.08 - 04 (1280x960) (8212) Barge Offloading - Dump Truck & Dozer - 02.12.08 - 01 (1280x960) (8212) Job Site - Equipment Mobilization - 10.12.08 - 08 (8212) Job Site - Equipment Mobilization - 10.12.08 - 03 (8212) Installation - Well #9 Site Prep - 10.12.08 - 02 (8212) Installation - Well #9 Drill Preparation - 11.12.08 - 01 (1280x960) (8212) Installation - Well #15 Site Hydration - 12.12.08 - 01 (1280x960) (8212) Installation - Well #13 Primary Bore Casing - 12.12.08 - 06 (1280x960) (8212) Installation - Well #13 Ratchet - 12.12.08 - 07 (1280x960) (8212) Installation - Well #13 Ratchet - 12.12.08 - 06 (1280x960) (8212) Installation - Well #9 Casing Installation - 11.12.08 - 01 (1280x960) (8212) Installation - Well #9 Auger Attachment - 11.12.08 - 02 (1280x960) (8212) Job Site - 11.12.08 - 01 (1280x960) (8212) Redevelopment - Well #6 Isolation Valve Install - 03.12.08 - 03 (1280x960) (8212) Redevelopment - Line Water Release - 03.12.08 - 01 (1280x960) (8212) Job Site - Water Level at Morning Lunar High Tide - 11.12.08 - 04 (1280x960)

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS