AFFF Removal Hangar 97

Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items in Hangar 97.

Scope of Work:

  1. Contractor shall recover all AFFF for Hanger 97 form reserve AFFF storage tanks on the north side of the hanger (approx. 2,000 gals).
  2. Contractor shall remove AFFF in FOD catch basin on the north side of Hanger 97(approx. 4,000 gals).
  3. Contractor shall clean FOD catch basin on the north side of hanger 97, removing all material from catch basin.
  4. Contractor shall clean the area around the storage tank to remove all material from the area.
  5. Contractor shall dispose of AFFF in accordance with federal and state guidelines.
  6. Contractor shall follow all manufacturer recommendations and requirements.
  7. Contractor shall notify Peter Turpen, fire department and building personnel upon completion of work