Alterations to Control Room Building 16079 HomeAlterations to Control Room Building 16079

Alterations to Control Room Building 16079

Federal Construction Group reorganized the interior of building 16079, Skytop Control Room, to increase customer viewing space, control room space and provide a larger repair area for Skytop personnel.  This scope of work included rearranging interior metal stud walls, add furring to walls, upgrading electrical, removal of existing raised flooring and old asbestos tile, new suspended acoustical ceiling, new paint and flooring and new interior doors.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS