CAAA Bldgs 145 and 148 Infill Windows HomeCAAA Bldgs 145 and 148 Infill Windows

Federal Construction Group, Inc. has been tasked to provide, labor, equipment, material and supervision to provide complete work to the following statement of work.

1. Building 145 Scope
The Intent of this work is to remove all existing windows and fill in windows with concrete and install metal siding that will blend in with existing siding. Replace doors with windows with new doors. All doors will require new hardware and closures.

Building 148 Scope
The Intent of this work is to remove all existing windows and fill in windows with 8”x8”x16” concrete masonry units “blocks” and paint to match exterior paint that will blend in with existing paint. Repair interior walls and paint to match existing. Replace doors with windows with new doors. All doors will require new hardware and closures.

2. Requirements
Building 145 Requirements
• Demolish existing windows and frames.
• Install #5 rebar.
• Pour concrete.
• Install siding, match color scheme to existing.
• Remove and replace 13 personnel doors and hardware.

Building 148 Requirements
• Demolish existing windows and frames.

Block widows openings with 8”x8”x16” concrete masonry units C.M.U.
• Align face of C.M.U. flush with exterior of concrete wall.
• Seal and paint exterior side of C.M.U.s to match exterior paint.
• Repair interior walls, where specified; 2 1/2” 20 gauge metal stud frame (match existing framing), insulate with R‐13 batting insulation, 5/8” foil back gypsum board, finish and match paint to existing walls.
• Remove and replace 5 personnel doors and hardware.

 