Fire Suppression Services Public Announcement System Repair HomeFire Suppression Services Public Announcement System Repair

Federal Construction Group, Inc. is tasked to fire alarm Public Announcement (PA) system in Bldg. 149. Currently the system does
operate correctly, causing delays in emergency responses.
Bldg. #149
a) Repair ceiling speakers (x7). Two speakers in bunk room, one speaker in break room, one speaker in crew chief office area, one speaker in east hallway, one speaker in south hallway , and one speaker in training room.
b) Repair surface mount speakers (x2). Speaker are located on the east wall of the truck bay. One speaker on the south east corner and one speaker on the northeast corner.
c) Replace amplifier 70v 1-zone. New amplifier needs to be a 70v 2-zone.
d) Install new wiring for all equipment listed above.
e) Fill all wall penetrations with fire caulking.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS