Floor Repairs Building 02640, Mainsite HomeFloor Repairs Building 02640, Mainsite

Floor Repairs Building 02640, Mainsite

Federal Construction Group removed the existing raised floor panels in the Advanced Systems Development facility, building 02640, which were aged and elaminated creating tripping hazards.  We also replaced the existing raised floor panels located in the Lauritsen Lab compound, approximately 2 miles north from Base Main Gate.  The existing under floor structures remained and were not damaged during construction.  The under floor structures included raised floor grid system, IDS system, electrical and phone wiring, conduits and piping.  The floor panel replacement was completed at 3 day flex Friday weekends only and all floors were made clean and safe at the end of each weekend work period for the end users. We replaced all existing raised floor panels with new floor panels, provided additional pedestal as necessary, and replaced the coffee area including cabinet, sink and plumbing and accessories.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS