Federal Construction Group upgraded the existing Radiation Portal Monitor (RPM) lanes at several Port of Los Angeles (POLA) and Port of Long Beach (POLB) cargo container terminals.  These upgrades required the addition of gate arms and inductive loops/controls as traffic control upgrades to improve officer safety, efficiency and traffic flow.  The installed equipment included: mobilization, demolition, infrastructure, fabrication, assembly, labor, materials, supervision and demobilization.