Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items and services necessary to perform: inspection, abatement, installation and repair to all items within this SOW.  All newly repair and or installed items shall be complete and useable upon completion of work.  Cleanup work site and dispose of any discarded material off station.
Scope of Work:
Bldg. 157 – Add grounding points in pump room and ground all fire alarm and fire suppression equipment to grounding point.
Bldg. 80 – Add grounding points in pump room and ground all fire alarm and fire suppression equipment to grounding point.
Bldg. 78 – Provide the following:
a) Remove existing NCA with DVC in main entrance of Bldg. 78
a) Installation NCA with DVC panel.
b) Installation & connect to existing DACT reporting system to report signals from newly installed FACP.
c) Add grounding points in pump room and ground all fire alarm and fire suppression equipment to grounding point.
Bldg. 76 – Add grounding points in pump room and ground all fire alarm and fire suppression equipment to grounding point.
Bldg. 75- Add grounding points in pump room and ground all fire alarm and fire suppression equipment to grounding point.