Install 2 Each 100A Safety Switches in the 43 Area HomeInstall 2 Each 100A Safety Switches in the 43 Area

Install 2 Each 100A Safety Switches in the 43 Area

Federal Construction Group connected two additional 100A safety quick disconnects to provide electrical power for the two new added mobile trailers to support ODS virtual training aids.  We removed the existing 200A Safety Disconnect and replaced with a NEMA 3R 400A Dist Panel.  We properly balanced out the electrical load between 3phases.  Connected the existing pole mount, 112.5KVA transformers to carry the new additional circuits.  Installed 2″ EMT conduits raceway and insert #3/0 copper wires, 3 wires secondary and ground wires with approximately 180 ft. long.  We installed 2 each NEMA 3R 50A outlets and 6″ x 6″ x 48″ gutter for proper distribution of 4 each 100A Safety Switched.  We coordinated with the end users and conducted the proper full load tests.

Digital Camera Digital Camera Digital Camera Digital Camera Digital Camera

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS