Install AC System for New Server Room at Building 1139 HomeInstall AC System for New Server Room at Building 1139

Install AC System for New Server Room at Building 1139

Federal Construction Group provided all labor, material, equipment and support necessary to add a 5 ton unit and a 3 ton unit to the existing chill water system in the new server rooms (room number 130 and 213).  Tap off existing chill water system and add (1) 5 ton air handler in the first floor server room and (1) 3 ton air handler inthe upstairs server room.  We also removed and disposed of all debris genereated from project.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS