Federal Construction Group, Inc. is tasked to install new electrical equipment that will divert power from the existing source to power either the existing equipment or the new thermal flash test equipment in room 150C of Michelson Laboratory.

Install a new 1200A 480V 3 phase transfer switch outside of room 150C of Michelson Laboratory. Install a new 1200A 480Y/277V 3 phase switchgear inside of room 150C.  Remove wiring from underground conduit that runs from existing transformer TX-10382 to the existing junction box. Remove existing junction box and install new junction box that will fit the new wiring. Install new wire in underground conduit from existing transformer to new transfer switch. Install new conduit and wire that will run from new transfer switch to the new switchgear and from the new transfer switch through the junction box and into the existing switchgear. Complete the entire installation in accordance with the current rules of the National Electric Code (NEC), NFPA 70, UFGS, and all applicable codes.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS