PE15321R Connect 52 and 62 Areas Electrical Distribution Systems HomePE15321R Connect 52 and 62 Areas Electrical Distribution Systems

PE15321R Connect 52 and 62 Areas Electrical Distribution Systems

Fed Con/South Bay Joint Venture is tasked to provide design and construction for PE15321R Connect 52 and 62 Areas Electrical Distribution Systems at MCB Camp Pendleton, CA. Provide Bio-monitor for Gnatcatcher breeding season from 15 Februrary-31 August to be complied with California Gnatcatcher Habitat, and Endangered Plant Habitat per CATEX requirement. Provide design and construction for steel power poles and associated devices for the entire route from 52 Area to NIAC (62 Area), as indicated in red and blue routes on Overall Map in Part 6.  Provide new 3-#500MCM copper, 15kV, 133% EPR, MV-105 power cable in spare conduit between the switchgear (52412) and pole 5262T1, a new (second) riser on pole 5262T1, and terminations at the top of pole 5262T1 and in the existing circuit breaker of the switchgear (52412). Reset the existing circuit breaker trip setting to accommodate the new circuit capacity.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS