Relocate Fire Hydrants at Building 1666 and Building 1766 HomeRelocate Fire Hydrants at Building 1666 and Building 1766

Relocate Fire Hydrants at Building 1666 and Building 1766

1628 - 90-Degree Elbow and Off-Set - 01 1628 - Backfill - 01 (2) 1628 - Backfill - 01 1628 - Backfill and Compact - 01 1628 - Backfill to Flush - 01 1628 - Backfill Trench - 01 1628 - Backfill Trench - 02 1628 - Bollard Install - 01 1628 - Bollard Install - 02 1628 - Bollard Install - 04 1628 - Bollard Install - 05 1628 - Bollard Install - 06 1628 - Bollard Install - 07 1628 - Bollard Install - 08 1628 - Bollard Install - 09 1628 - Bollard Placement - 01 1628 - Bollard Primer Paint - 01 1628 - Cap Existing Pipe Below Grade - 01 1628 - Cleaning Flange Surfaces - 01 1628 - Compact Backfill - 01 1628 - Compact Fill - 01 1628 - Compact Fill - 02 1628 - Compacting Backfill - 01 1628 - Compacting Backfilll - 02 1628 - Compacting Base Material - 01 1628 - Completed Install - 01 1628 - Completed Install - 02 1628 - Concrete Footing Install - 01 1628 - Concrete Footing Install - 02 1628 - Concrete Footing Install - 03 1628 - Concrete Footing Install - 04 1628 - Cut Existing UG Pipe - 01 1628 - Decommissioned Hydrant - 01 1628 - Demo Existing AC - 01 1628 - Demo Existing AC - 02 1628 - Dewater Trench - 02 1628 - Excavation - 01 1628 - Excavation - 02 1628 - Excavation - 03 1628 - Excavation - 04 1628 - Excavation - 05 1628 - Excavation - 06 1628 - Existing Riser - 01 1628 - Existing Stub-up - 01 1628 - Flange with Centering Bolts - 01 1628 - Flange with Centering Bolts - 02 1628 - Hand Dig and Locate - 01 1628 - Housekeeping - 01 1628 - Hydrant Install - 01 1628 - Hydrant Install - 02 1628 - Hydrant Install - 03 1628 - Install 90-Degree Elbow - 01 1628 - Install Base Material - 01 1628 - Install Flange Bolts - 01 1628 - Install Hydrant - 01 1628 - Install Hydrant - 02 1628 - Install New Hydrant - 01 1628 - Install PCC Thrust Block - 01 1628 - Install PCC Thrust Block - 02 1628 - Install Riser - 01 1628 - Install Riser - 02 1628 - Install Riser - 03 1628 - Installing Threaded Rod - 01 1628 - Leveling Riser - 01 1628 - Line Flush Test - 01 1628 - Line Flush Test - 02 1628 - Line Flush Test - 03 1628 - Line Flush Test - 04 1628 - Line Flush Test - 05 1628 - Mark Existing UG Pipe for Cutting - 01 1628 - Marking Jobsite - 01 1628 - Mobilize Equipment - 01 1628 - Off-Set 90-Degree to Riser - 01 1628 - Off-Set Install - 01 1628 - Off-Set Protected with Riser and O-Rings - 01 1628 - O-Ring Placement - 01 1628 - Paving - 01 1628 - Paving - 02 1628 - Paving - 03 1628 - Paving - 04 1628 - Paving - 05 1628 - Paving Compaction - 01 1628 - Paving Compaction - 02 1628 - Paving Compaction - 03 1628 - Paving Tack Strip - 01 1628 - Paving Tack Strip - 02 1628 - Paving Tack Strip - 03 1628 - Place Sand Bag Thrust Fill - 01 1628 - Protected Riser - 01 1628 - Remove Existing Hydrant - 01 1628 - Removing Existing Stub-up - 01 1628 - Riser with Break-Away - 01 1628 - Riser with Break-Away - 02 1628 - Safety Netting - 01 1628 - Sawcut - 01 1628 - Secured Area - 01 1628 - Shut-Off Water Valve - 01 1628 - Site Evaluation - 01 1628 - Striping - 01 1628 - Striping - 02 1628 - Striping - 03 1628 - Striping Preparation - 01 1628 - Striping Preparation - 02 1628 - Striping Preparation - 03 1628 - Striping Preparation - 04 1628 - Temporary Cap and Backfill - 01 1628 - Thrust Blocks at Off-Set - 01Federal Construction Group relocated four (4) fire hydrants that were positioned in the front yard area between the front and backside of the existing sidewalk at buildings 1666 and 1766.  The fire hydrants were relocated so that they were placed perpendicular from their existing locations to a new position perpendicular to the existing curb.  We relocated the fire hydrants to the new location between the face of the curb and the edge of the adjacent traffic lane to a position 3 to 7 feet from the inside edge of the traffic lane.  The relocated fire hydrants were placed in a line perpendicular to the curb to their new point of placement.  The drawings provided for this project were illustrative only and we had to field verify all dimensions and identify all permanent points of placement prior to the physical installation.  The fire hydrant main connecting hub was placed facing away from the existing curb.

29 Palms Hydrant Relocate Job 045 29 Palms Hydrant Relocate Job 046 29 Palms Hydrant Relocate Job 047 29 Palms Hydrant Relocate Job 048

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS