Repair Culverts, Construct Asphalt Foot Path and Retaining Wall at 43 Area Ammunition Supply Point HomeRepair Culverts, Construct Asphalt Foot Path and Retaining Wall at 43 Area Ammunition Supply Point

Repair Culverts, Construct Asphalt Foot Path and Retaining Wall at 43 Area Ammunition Supply Point

Federal Construction Group repaired the culverts, constructed an asphalt foot path and retaining wall at 43 area by scarifing and re-compacting approximately 1100 linear foot x 8′ foot patch and placing 4″ of Class II Base and 4″ of asphalt concrete over the entire length of the foot path.  We prepared and reconstructed the drainage ditch along both sides of the foot path and repaired the earth embankment along the fence line near the second guard shack.  We provided winged headwalls and culverts where culverts cross under and follow the new foot path.  We were able to repair the damaged culvert on the perimeter road and provided winged head and end wall on the culvert and reconstructed the road.  We demolished the existing wooden retaining wall and stairs and provided a segmental retaining wall.  The wall was approximately 130 linear feet in length and ranged from 4′ to 2′ above road.  Provided earthen and concrete swales as necessary, finished grade and provided erosion control to the exposed areas.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS