Repair Fire Suppression System Bldg. 31198 HomeRepair Fire Suppression System Bldg. 31198

Repair Fire Suppression System Bldg. 31198

FedCon/South Bay Joint Venture is tasked provide service and inspection of the existing dry chemical fire suppression system for the Coating Facility, Bldg. 31198, so that the fire suppression portion of this system is fully operational.

1. Provide service and inspection of the existing dry chemical fire suppression system for the coating facility, Bldg. 31198. Only equipment specifically Listed and compatible for use with the existing system shall be used. Work to include, but not limited to the following:

a. Replacement of existing cylinders. New cylinders are to be recharged.

b. Replacement of existing actuation control head.

c. Replacement of the existing time delay.

d. Replacement of system valve actuators.

e. Replacement of activation hoses.

f. Replacement of the fusible links.

g. Replacement of the nozzle caps.

h. Acceptance testing in accordance with NFPA 17 (witnessed by a NAVFAC FPE).

 

 

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS