Repair Kraus Road at 21 Area HomeRepair Kraus Road at 21 Area

Federal Construction Group did the repairs to Kraus Road at Camp Pendleton 21 Area by saw cutting, pulverizing and removing approximately 36,000 square feet of damaged asphalt on the roadway, to a depth of 14 inches.  We mixed and re-compacted (to 95%) the existing grinded A/C pavement with existing and new base material to create 8″ of Class II base and overlay with 6″ of new asphalt concrete mix.  The final pavement elevations ramined the same as existing after new pavement was placed.  We then restriped all traffic markings (edge lines, center lines, raised reflective pavement markers).

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS