Repair Multiple Buidlings with Various Fire Suppression Systems

Federal Construction Group, Inc. is tasked to provide all personnel, equipment, tools, materials, technical supervision and other items andservices necessary to perform: inspection, abatement, installation and repair to all items within this SOW. This SOW covers multiply buildings with various fire suppression repairs.

Bldg. 3345 Remove existing broken jockey pump for fire pump system. Install new jockey pump. Jockey pump must be sized for use with the existing fire pump at Bldg. 3345

Bldg. 146 Remove leaking sprinkler head and piping in high bay of Hanger 146. Install sprinkler head and new piping in high bay of Hanger 146

Bldg. 408 Remove broken air compressor for dry pipe fire suppression system. Install new air compressor for dry pipe fire suppression system. Air compressor must be sized per the NFPA and UFC for the size of the dry pipe fire suppression system. Install new fire suppression sprinkler piping hanger in downstairs mechanical room. Current piping hanger missing.

Bldg. 635 Remove existing broken jockey pump for fire pump system. Install new jockey pump. Jockey pump must be sized for use with the existing fire pump at Bldg. 635

Bldg. 634 Remove existing broken jockey pump controller. Install new pump controller for jockey pump. New controller must be able to be connect to existing available electrical power.

Bldg. 80 Remove existing broken fire pump controller. Install new fire pump controller. Fire pump controller must be sized for use with the existing fire pump at Bldg. 80.

Bldg. 75 Remove existing broken fire pump controller. Install new fire pump controller. Fire pump controller must be sized for use with the existing fire pump at Bldg. 75.

Bldg. 315 Repair diesel fire pump at Bldg. 315

Bldg. 1200 Remove frozen sprinkler and piping in walk-in freezer. Install new sprinkler and piping in walk-in freezer

Bldg. 859 Remove leaking fire suppression piping in south west ladder well. Install new piping for fire suppression sprinkler line in south west ladder well.

Bldg. 672 Remove leaking fire riser coupling on main fire riser. Install new riser coupling on main fire riser.

Bldg. 3203 Remove corroded main drain for fire suppression system. Install new main drain for fire suppression system.

Bldg. 672 Remove leaking fire riser coupling on main fire riser. Install new riser coupling on main fire riser.

Bldg. 603 Remove corroded main drain for fire suppression system. Install new main drain for fire suppression system.

Bldg. 3244 Remove corroded piping on main fire riser. Install new piping on main fire riser.

Bldg. 157 Remove leaking pressures relief valves (x3) on fire pumps. Install new pressure relief valves (x3) on fire pumps