Repair North Range Electrical Distribution

Fed Con/South Bay Joint Venture is tasked to repair the electrical distribution systems at NAWS China Lake, CA. New NAF Substation must be ready for operation as approved by Contracting Officer before work is started on demolition of existing NAF Substation which would interfere with normal operation.  The existing NAF Substation will remain in operation during the entire
construction period. Fed Con/South Bay Joint Venture must conduct operations so as to cause the least possible interference with normal operations of the activity.  Permission to interrupt any activity roads, railroads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.