Repairs to Room 404 Building 31455

Federal Construction Group removed metal double door and frame between rooms 404 and 404a,  and all out of use HVAC controls, ductwork and electrical as necessary to clear room 404.  We painted room 404 and provided redi-key access control hardware to room 404.  Installed two (2)  new ductless mini-split HVAC units in rooms 403 and 404 and power to the unit with safety disconnect.  Installed new a-b electrical switches for lighting along with new 120v protected tele-power poles for workbenches.  Installed two (2) new 4″ rigid conduits between room 404 and the tower building 31456 and primed and painted all the walls.  Removed and replaced the existing t-bar ceiling with a new t-bar ceiling.  Removed and replaced all lay-in fluorescent light fextures with new lay-in fluorescent light fixtures.  Tap-off existing 100 amp load center and added new 100 amp load center with 12 circuit breakers.  Repaired flush bolts and added weather seals to double doors in room 404a.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS