Replace A/C System in Building 32940 HomeReplace A/C System in Building 32940

Federal Construction Group is demolishing two packaged roof mounted heating, cooling and ventilating units including electical controls, condensate piping and flexible ductwork couplings and one packaged ground mounted cooling unit including electrical controls, condenstate piping and flexible ductwork couplings.  We are installing two packaged roof mounted heating, air condition and ventilating units of equal size of the units being removed, approved for coastal installations and factory coated with corrosion resistant material.  We are also installing one packaged ground mounted cooling and ventilating unit of equal size of the unit being removed, approved for coastal installations and factory coated with corrosion resistant material.  At roof location, condensate piping shall be copper and drain to nearest roof drain scupper or rain gutter at ground location, condesate piping shall drain to the ground.  We are utilizing existing ductwork to maximum extent and replacing all flexible coupling and sealing ductwork penetrations into the building.  At the ground mounted unit location we are scraping loose and flaking paint and repainting ductwork to match existing color.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS