Replace Cooling Towers SS Wing Building 00005 HomeReplace Cooling Towers SS Wing Building 00005

Federal Construction Group is providing a new stainless steel, top mounted axial fan, induced draft cooling tower to replace the existing fiberglass cooling tower.  The new tower will be the same type and capacity as existing cooling tower.  Blowers on the new towers shall have ball bearings with grease zerk fittings.  The new cooling tower will also have a maintenance platform and access ladder.  New cooling tower will also have electric basin heaters sized to maintain +40 degrees F basin water temperature at a 0 degree F ambient temperature and 10 mph wind speed for freeze protection.  The basin heaters will be electric immersion type controlled by a remote thermostat with the sensing bulb located in the basin water.  Basin heaters will be provided with factory-installed low water level cutout switch to prevent heater operation unless the heater element is fully submerged.

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS