Replace Michelson Lab Substation at NAWS, China Lake, CA HomeReplace Michelson Lab Substation at NAWS, China Lake, CA

Replace Michelson Lab Substation at NAWS, China Lake, CA

Fed Con/South Bay Joint Venture is tasked to replace the Michelson Lab Substation with a new Michelson Lab Substation west of the existing substation and incidental related work.

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work.