Replace Water Heater in Building 00005 HomeReplace Water Heater in Building 00005

Replace Water Heater in Building 00005

Federal Construction Group replaced the leaking steam water heater unit that was located in Wing 6 basement equipment room (B-60) of Michelson Lab.  This unit provided hot water to the laboratory areas within the Chemistry Division located in Wing 6 and the showers located in the men’s head (Room 1082) and women’s head (Room 1078).

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS