RPM Installation at Walpole-Algonac Ferry Crossing

Federal Construction Group was tasked to install a radiation portal monitor (RPM) system at Walpole-Algonac Ferry Crossing.  The total quantity of system components included one (1) POV Primary RPM.  The RPM type was installed on foundations which included anchoring, assembling and erecting the RPM.  Installing RPM control and battery boxes, vehicle presence sensors, mounting exterior annunciator on the RPM and providing and installing the area lighting.  We also install the equipment and furnishings inside the existing building, installed anchors, unistrut, juntion boxes, raceways, conduit, and wiring, signage and pavement markings.  The technical work included erection of heavy steel enclosures, metal fabrications, concrete traffic barriers, electrical wiring, and communication networks.  The RPM system is located adjacent to the existing building.  Installation work did not interfere with daily terminal traffic requirements.

(86830) Site Work - General Site Conditions - 01 (86830) Site Work - Flagpole Sand Set - 01 (86830) Site Work - Finished Flatwork & ADA Ramp - 02  (86830) Stripping - Pedestrian & Traffic Stripping - 01 (86830) UG Work - Excavation of Installed CDF - 02 (86830) UG Work - CDF Pour - 04 (86830) UG Work - CDF Pour - 01 (86830) Testing - Concrete Testing Sample - 02 (86830) Testing - Concrete Testing Sample - 01 (86830) UG Work - Handhole - 02 (86830) UG Work - Handhole & Conduit - 02 (86830) UG Work - Install of Class II Base - 01 (86830) UG Work - Sawcutting Slag - 01 (86830) UG Work - Splice Work - 01 (86830) UG Work - Tack Application - 01 (86830) UG Work - Unidentified Utility Trench - 03 (86830) UG Work - Unidentified Utility Trenching - 02 (86830) UG Work - Utility Work - 01 (86830) Welding - Preparing Bollard for Signage - 02 (86830) Welding - Preparing Bollard for Signage - 01 (86830) Bollards - Bollard Install - 04 (86830) Bollards - Bollard Install - 05 (86830) Bollards - Bollard Install Prep - 01 (86830) Electrical - Interior Work - 03 (86830) Electrical - Interior Work - 04 (86830) Electrical - Power & Comm Conduit Runs - 01 (86830) Electrical - Power Conduit Run - 01 (86830) Excavation - Bollard Removal in Front of Driverside Column - 04 (86830) Excavation - Caisson Drilling - 01 (86830) Excavation - Caisson Drilling - 02 (86830) Excavation - Caisson Drilling - 03 (86830) Excavation - Passengerside Foundation Prep - 02 (86830) Excavation - QC & Elevation - 01 (86830) Excavation - RPM Footing Removal - 01 (86830) Excavation - RPM Footing Removal - 02 (86830) Excavation - Sawcut RPM Footing - 01 (86830) Excavation - Sonotube Install - 01 (86830) Excavation - Steel Cage & Chair - 01 (86830) Excavation - Steel Cage Prep - 01 (86830) Excavation - Steel Casing After Work Stoppage - 03 (86830) Excavation - Steel Casing Off-Load - 02 (86830) Excavation - Vac Truck & Concrete Truck Prepped for Pour - 01 (86830) Excavation - Vac Truck & Concrete Truck Prepped for Pour - 02 (86830) HMAC - AC Curbing - 01 (86830) HMAC - AC Raking - 01 (86830) HMAC - AC Sealant - 02 (86830) HMAC - Finished HMAC - 01 (86830) HMAC - HMAC Laydown of 1st Lift - 01 (86830) HMAC - Roller Compaction - 01 (86830) HMAC - Vibraplate Compaction - 01 (86830) Housekeeping - Prepwork to Repair Damaged Ramping - 01 (86830) Housekeeping - Remove Remaining Site Materials - 01 (86830) Install - Painted Bollards - 01 (86830) Install - Alt. Step Placement - 01 (86830) Layout - RPM Location - 02 SANYO DIGITAL CAMERA SANYO DIGITAL CAMERA (86830) RPM Footing - Concrete Placement - 01 (86830) RPM Footing - Concrete Placement - 08 (86830) RPM Footing - Concrete Placement - 09 (86830) RPM Footing - Foundation Excavation - 01 (86830) RPM Install - Unit Placement - 01 (86830) RPM Install - Unit Placement - 02 (86830) RPM Install - Unit Placement - 03 (86830) RPM Install - Comm & Power Box Install - 01 (86830) RPM Install - Comm & Power Box Offload - 01 (86830) RPM Install - Unit Pick Readjustment - 01 (86830) RPM Install - Unit Lift - 01 (86830) Site Conditions - Completed Signage Install - 01 (86830) Site Work - ADA Ramp & Flatwork Pour - 01 (86830) Site Work - ADA Ramp & Flatwork Forming - 02 (86830) Site Work - Finished Flatwork & ADA Ramp - 02 (86830) Site Work - Finished Flatwork & ADA Ramp - 01

Other Projects

© 2008 -2013 Federal Construction Group - All rights reserved | Designed by iDZYNS